My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-15 EDA Packet
Centerville
>
EDA
>
Agenda Packets
>
2022
>
2022-06-15 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2022 3:25:50 PM
Creation date
6/9/2022 3:25:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
School staff and consultants were able to find a work-around to solve some supply chain issues. <br />The work in the building is nearing completion and should receive their certificate of <br />occupancy soon. <br /> <br />stnd <br />(3)(4) Old Mill Estates 1 and 2 Additions <br />The developer is looking to finalize his punch list by June 10. Once this is done, the city can <br />release their letter of credit. <br /> <br />City staff and the homeowner adjacent to the trail on Old Mill Court have been exploring an <br />alternative to the boardwalk concept. In short, we would be moving a retaining wall, without <br />encroaching on the wetland. The wall can move about 4 to 5 feet, which is looking like a more <br />financially feasible option at this point and one that both the city and homeowner can be happy <br />with. <br /> <br />th <br />(16) Centerville Storage (20Ave. Mini Storage) <br />A Grand Opening will be held on June 7, from Noon to 1 PM. Come check it out! <br /> <br />(1) Bay View Villas (Waterworks Site) <br />Correspondence has been sent to the developer regarding final punch list items. We are <br />awaiting a response. <br /> <br />(8) Atlas Villas Memory Care Project (1825 Main Street) <br />Work inside the building is nearly complete. The owner is <br />now hiring staff and working towards licensure. A new <br />estimated opening date is August 1, 2022. The owners have <br />requested a one-year extension to the Interim Use Permit to <br />allow for the delays caused by supply chain issues and <br />construction cost volatility. <br /> <br />(10-14) Rehbein Commercial <br />st <br />Sidewalk work along 21 Avenue has been completed with irrigation restoration and boulevard <br />sodding to follow. <br /> <br />The city and Rice Creek Watershed have been following up with the developer on erosion <br />control issues. The developer has been responsive and restored their perimeter controls and <br />removed sediment from the creek. <br /> <br />(13) Kwik Trip <br />Staff has been working with Kwik TripÓs staff to get securities and other agreements in place. <br />The owner has communicated that construction could begin by mid-summer, 2022. <br /> <br />Recently, the siteÓs engineer finalized plans for the right turn lane to be constructed on Main <br />Street on the south side of the store and obtained signatures from both the City and County <br />thst <br />Engineers. With this work, the sidewalk from 20 to 21 Avenues on the north side of Main <br />st <br />Street and up 21 Avenue from Main Street to Michaud Way will be constructed. <br /> <br />(11) Norbella Senior Living <br />Work on the interior of the building continues, including HVAC, plumbing and electrical. A <br />September opening is still the target. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.