My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-21 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2022
>
2022-06-21 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 11:49:40 AM
Creation date
6/20/2022 11:49:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2022 THIN OVERLAY PROGRAM/CITY HALL PARKING LOT IMPROVEMENTS <br />Project Costs <br />CONSTRUCTION COSTS <br />Cost estimates for each of the roads and the parking lot are shown below. This cost estimate is <br />based on bid prices from recent bid prices and include a 20% contingency. <br />SOFT COSTS <br />In addition to construction costs, other costs which affect the overall project costs include legal, <br />engineering feasibility, design and construction administration costs. These costs are included in the <br />total project costs presented below. <br />PROJECT COSTS <br />Total project costs are the total of both construction and soft costs and are summarized below: <br />Estimated Project <br />ApproximateEstimated Total <br />LocationCosts Per Lineal <br />Length \[LF\]Project Costs <br />Foot <br /> 1” Overlays <br />Beaver Pond Way* <br />1775$50.50$92,000 <br />Hunters Ridge Lane* <br />1265$50.50$60,000 <br />Dupre Road – West of Centerville Rd <br />975$50.50$47,000 <br />Dupre Road – East of Centerville Rd <br />3300$50.50$155,000 <br />Widgeon Circle* <br />235$50.50$16,000 <br />Mallard Way* <br /> 475$50.50$22,000 <br />Grouse Hollow* <br />180$50.50$16,000 <br />Pheasant Lane – N of Partridge Place <br />200$50.50$10,000 <br />Pheasant Lane – S of Partridge Place <br />365$50.50$17,000 <br />Partridge Place* <br />1480$50.50$82,000 <br />Progress Road <br />340$50.50$18,000 <br />TOTAL OVERLAY <br />10,590$535,000 <br />City Hall Parking Lot Improvements <br />Full Depth Removal and Pave <br />--$91,000 <br />Reconstruct SW Quadrant <br />--$68,000 <br />Channel Improvements <br />--$7,000 <br />Pedestrian Improvements <br />--$10,000 <br />TOTAL CITY HALL PARKING LOT <br />$176,000 <br />Estimated Total Project Cost$711,000 <br />*Length includes equivalent footages to account for cul-de-sacs <br />City of CentervillePage 4 <br />2022 Thin Overlay Program193805625 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.