Laserfiche WebLink
OPINION OF PROBABLE COST <br />THIN OVERLAY IMPROVEMENTS <br />CENTERVILLE, MN <br />June 16, 2022 <br />ITEMUNITQTYUNIT PRICECOST <br />MOBILIZATIONLS1$20,000.00$20,000.00 <br />TRAFFIC CONTROLLS1$7,000.00$7,000.00 <br />MILL BITUMINOUS SURFACE (1")SY2700$3.00$8,100.00 <br />REMOVE AND REPLACE CURB AND GUTTERLF1130$32.00$36,160.00 <br />BITUMINOUS PATCHING MIXTURETN100$160.00$16,000.00 <br />ADJUST VALVE BOXEA35$400.00$14,000.00 <br />ADJUST CASTING (IN STREET)EA55$700.00$38,500.00 <br />ADJUST CASTING (CURB INLET)EA55$700.00$38,500.00 <br />BITUMINOUS MATERIAL FOR TACK COATGAL2760$3.00$8,280.00 <br />BITUMINOUS ASPHALT MATERIAL (Wear - 1")TON2300$80.00$184,000.00 <br />STRIPINGLS1$1,000.00$1,000.00 <br />SUBTOTAL$371,540.00 <br />20% CONSTRUCTION CONTINGENCY$74,308.00 <br />SUBTOTAL CONSTRUCTION COSTS$445,848.00 <br />20% INDIRECT COSTS$89,169.60 <br />TOTAL ESTIMATED PROJECT COSTS$535,017.60 <br /> <br />