My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #22-016 - Approving Land Use Documents for the Fairview Second Addition Plat
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2022
>
Res. #22-016 - Approving Land Use Documents for the Fairview Second Addition Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 9:27:19 AM
Creation date
6/23/2022 9:24:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Owner, its contractors, and subcontractors, shall follow all instructions received from <br />the City and Rice Creek Watershed inspectors, so long as in conformity with the Development <br />Plans. The Owner's engineer shall provide for on -site project management. The Owner or its <br />engineer shall schedule a pre -construction meeting at a mutually agreeable time and location with <br />all parties concerned, including the City Engineer, inspector and/or consultants, to review the <br />program for the construction of the Public Improvements. Prior to the pre -construction meeting, <br />Owner shall supply a schedule of construction activities for the Public Improvements and shall <br />amend the schedule from time to time as necessary. Before the Security for the completion of <br />Public Improvements is released in total, iron monuments must be installed in accordance with <br />Minn. Stat. Chapter 505. The Owner's surveyor shall submit a written notice to the City certifying <br />that the monuments have been installed. <br />7. PERMITS. The Owner shall obtain, or require its contractors and subcontractors <br />to obtain, all necessary permits. Those permits obtained by Owner to begin work include, but are <br />not limited to: <br />A. Anoka County Permit for Work within the County Right -of -Way <br />B. National Pollution Detection and Eliminations System (NDPES) Construction Site <br />Stormwater Discharge Permit <br />C. Rice Creek Watershed District Permit <br />i. Wetland Impacts (if applicable) <br />ii. Stormwater <br />D. Rice Creek Watershed District --- MaintenanceAjregiment <br />D-E. Department of Natural Resources (DNR) Dewatering Permit (if necessary) <br />€F. City of Centerville - Building Permit <br />F G. City of Centerville— Grading Permit for land disturbing activities. <br />Q-H. City of Centerville— Right -of -Way Permits for small utilities such as gas, phone, <br />electric, cable TV. <br />8. TIME OF PERFORMANCE. The Owner shall install all required Public <br />Improvements in the Development Plans with the exception of the final wear course of asphalt by <br />December 31, 2022. Owner shall install the wear course by November 1, 2023. The Owner may, <br />however, request an extension of time from the City. The City may exercise the power to delay <br />DEVELOPMENT & SUBDIVISION AGREEMENT <br />CENTERVILLE AND AMAZON.COM <br />Draft Version 06120212022 W2 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.