Laserfiche WebLink
OPINION OF PROBABLE COST <br />THIN OVERLAY IMPROVEMENTS <br />CENTERVILLE, MN <br />June 16, 2022 <br />ITEM UNIT CITY UNIT PRICE COST <br />MOBILIZATION <br />TRAFFIC CONTROL <br />MILL BITUMINOUS SURFACE (1") <br />REMOVE AND REPLACE CURB AND GUTTER <br />BITUMINOUS PATCHING MIXTURE <br />ADJUST VALVE BOX <br />ADJUST CASTING (IN STREET) <br />ADJUST CASTING (CURB INLET) <br />BITUMINOUS MATERIAL FOR TACK COAT <br />BITUMINOUS ASPHALT MATERIAL (Wear 1") <br />STRIPING <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />LS <br />1 <br />$7,000.00 <br />$7,000.00 <br />SY <br />2700 <br />$3.00 <br />$8,100.00 <br />LF <br />1130 <br />$32.00 <br />$36,160.00 <br />TN <br />100 <br />$160.00 <br />$16,000.00 <br />EA <br />35 <br />$400.00 <br />$14,000.00 <br />EA <br />55 <br />$700.00 <br />$38,500.00 <br />EA <br />55 <br />$700.00 <br />$38,500.00 <br />GAL <br />2760 <br />$3.00 <br />$8,280.00 <br />TON <br />2300 <br />$80.00 <br />$184,000.00 <br />LS <br />1 <br />$1,000.00 <br />$1,000.00 <br />SUBTOTAL $371,540.00 <br />20% CONSTRUCTION CONTINGENCY $74,308.00 <br />SUBTOTAL CONSTRUCTION COSTS $445,848.00 <br />20% INDIRECT COSTS $89,169.60 <br />TOTAL ESTIMATED PROJECT COSTS $535,017.60 <br />