My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-11 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2022
>
2022-07-11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2023 3:52:54 PM
Creation date
7/9/2022 12:30:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNITESTIMATED <br />NO.ITEMUNITESTIMATED COST <br />PRICEQUANTITY <br />PART 2: CITY HALL PARKING LOT IMPROVEMENTS <br />MOBILIZATIONLS <br />1$16,000.006,000.00$ <br />2TRAFFIC CONTROLLS$12,000.002,000.00$ <br />MACHINE-SLICED SILT FENCELF <br />3$90270.003.00$ <br />CLEAR AND GRUBLS <br />4$12,000.002,000.00$ <br />REMOVE CURB AND GUTTERLF <br />5$2502,500.0010.00$ <br />REMOVE CONCRETE SIDEWALK OR PADSF <br />6$140560.004.00$ <br />REMOVE BITUMINOUS PAVEMENT (PARKING LOT)SY <br />7$3,2009,600.003.00$ <br />MILL BITUMINOUS CONSTRUCTION JOINTLF <br />8$120480.004.00$ <br />9COMMON EXCAVATION (P)CY14.00$5507,700.00$ <br />10SUBGRADE EXCAVATIONCY14.00$1001,400.00$ <br />11GEOTEXTILE FABRIC, TYPE VSY2.50$7001,750.00$ <br />AGGREGATE BASE, CLASS 5TN <br />12$3507,000.0020.00$ <br />SELECT GRANULAR BORROWCY <br />13$40012,000.0030.00$ <br />CONCRETE CURB AND GUTTER - B612LF <br />14$2506,000.0024.00$ <br />CONCRETE PEDESTRIAN RAMPSF <br />15$801,440.0018.00$ <br />TRUNCATED DOME SURFACESF <br />16$10600.0060.00$ <br />BITUMINOUS TACK COATGAL <br />17$180540.003.00$ <br />BITUMINOUS WEAR COURSETON <br />18$30027,000.0090.00$ <br />BITUMINOUS BASE COURSETON <br />19$40032,000.0080.00$ <br />TOPSOIL BORROWCY <br />20$401,600.0040.00$ <br />SEED WITH EROSION CONTROL BLANKETSY <br />21$140560.004.00$ <br />SOLID WHITE LINE WITH EPOXYLF <br />22$11001,100.001.00$ <br />STREET SWEEPER (PICKUP BROOM W/OPERATOR)HR <br />23$5600.00120.00$ <br />PART 2 SUBTOTAL <br />$124,700.00 <br />CONSTRUCTION CONTINGENCY (5%)$6,235.00 <br />SUBTOTAL - CONSTRUCTION$130,935.00 <br />INDIRECT COSTS (20%)$26,187.00 <br />PART 2 - TOTAL ESTIMATED PROJECT COST$157,122.00 <br />COST SUMMARY <br />PART 1: THIN OVERLAY$534,756.60 <br />PART 2: CITY HALL PARKING LOT$157,122.00 <br />TOTAL ESTIMATED PROJECT COSTS$691,878.60 <br />Copy of 2022 Thin Overlay SEQ-90%.xlsx7/6/2022 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.