My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-09-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2006 9:47:37 AM
Creation date
9/11/2006 9:59:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />J[jj Bonestroo <br />IIlCIIII Rosene <br />'"" Anderlik & <br />'\11 Assodates <br />engineers & Architects <br /> <br />2335 West Highway 36 · Sf Paul. MN 55113 <br />OffIce: 651-636-4600 . Fax: 651-636-1311 <br /> <br />wwwbonestroocom <br /> <br />August 25, 2006 <br /> <br />Dallas Larson <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038~9794 <br /> <br />Re: CSAH 14 Reconstruction <br />Additional Water Main Improvements <br />BRAA File No. 000616-04144-0 <br /> <br />Dear Dallas, <br /> <br />Unfortunately, I am writing to inform you that it appears, after our further investigation, that tbe <br />City will indeed be required to move its 12-inch water main near the "Water Works Nighclub" <br />site to accommodate a proposed retaining wall which will be a part of the County's CSAH 14 <br />reconstruction. Additionally, the far northwest end of the proposed wall appears to interfere with <br />the City's existing gravity sanitary sewer. We are working with SRF and the County to redesign <br />that small portion ofthe wall in order to avoid moving our sewer pipe. <br /> <br />Previously we had submitted an engineering proposal to design water main and foreemain <br />improvements to be bid in conjunction with the SRF-designed CSAH 14 reconstruction. The <br />water main portion of that design was to be limited to new water main along Main Street from <br />Progress to Goifon. <br /> <br />In order to complete the necessary design of this water main reroute we will need to ask for an <br />additional $5,000 to be added our not-to-exceed fee of $1 0,000. If the City finds this acceptable, <br />we would complete the same scope of services outlined in our original letter (attached) for the <br />added water main improvements. If a reroute of the gravity sanitary sewer pipe is also needed, <br />we would provide a separate proposal to complete that redesign. <br /> <br />Sincerely, <br />BONESTROO ROSENE ANDERLIK & ASSOCIATES, INC. <br /> <br />.~#'~ <br /> <br />Mark Statz, PE <br />City Engineer <br /> <br />Attachments <br /> <br />Copy: <br /> <br />R.JG - BRAA <br />File <br />St Paul. St Cloud. Rochester. MN · Milwaukee. WI · Chicago. Il <br /> <br />Affirmative Action/Equal Opportunity Employer and Employee Owned <br /> <br />J! <br />
The URL can be used to link to this page
Your browser does not support the video tag.