My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-27 Administrator's Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2018-2022
>
2022
>
2022-07-27 Administrator's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2022 4:28:31 PM
Creation date
7/27/2022 4:28:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEWER AND WATER <br />Commercial Water Connection Fee Assistance <br />At the last City Council meeting, the Council voted to extend the program through the end of 2023. <br />The program offers half-priced hook-up charges for businesses hooking to city water. <br /> <br />Wellhead Protection Plan <br />The Minnesota Department of Health held a kick-off meeting with city staff and consultants for the <br />implementation of the cityÓs Part-2 Wellhead Protection Plan. The group reviewed items in the <br />documents and the timelines associated with various activities. Staff will be following up on the <br />action items over the course of the next few months. <br /> <br />Well #2 Repairs <br />The cityÓs primary well (Well #2) started having some electrical problems a few months ago. Several <br />weeks ago, those problems got worse and ended up necessitating having the 14-year old pump and motor <br />replaced, along with the Variable Frequency Drive which runs the motor. In total, costs for the <br />replacement of these components amounted to just under $25,000. City staff made the decision to replace <br />these elements in short order, without bringing them before the council for a number of reasons. First, <br />having the cityÓs primary well out of service during the heat of the summer, is not a desireable situation. <br />Secondly, some of the parts were in and out of back-order status and staff felt it wise to move while they <br />were available on a timely basis. <br /> <br />We are happy to report that, during this outage, our redundant systems performed very well. The cityÓs <br />secondary well (Well #1) was able to keep up and the chemical and monitoring equipment at that well <br />performed as expected. Additional redundancies, in our two interconnections to the Lino Lakes water <br />system were double checked and stood at the ready. However, they were never needed, due to the <br />adjustments made by our public works department and the performance of our back-up well. <br /> <br />This situation was a reminder of the many things that go on behind the scenes to ensure our sewer and <br />water customers have reliable and safe service. Our staff and built-in redundant systems performed well <br />and we were glad to have them both at the ready. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.