My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-18 City Code
Centerville
>
Ordinances
>
City Code
>
2022-07-18 City Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2022 7:18:26 AM
Creation date
8/1/2022 7:17:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(a) An excavation permit is required to excavate that part of the right-of-way described in the <br />permit and to hinder free and open passage over the specified portion of the right-of-way, <br />to the extent and for the duration specified therein. <br />(b) An obstruction permit is not required if a person already possesses a valid excavation <br />permit for the same project. <br /> <br />(2) Obstruction permit. <br />(a) An obstruction permit is required to hinder free and open passage over the specified <br />portion of rights-of-way by placing equipment and/or garbage containers described <br />therein on the rights-of-way, to the extent and for the duration specified therein. <br />(b) An obstruction permit is not required if a person already possesses a valid excavation <br />permit for the same project. <br /> <br />(3) Small wireless facility permit. A small wireless facility permit is required by a registrant to erect <br />or install a wireless support structure, to collocate a small wireless facility, or to otherwise install <br />a small wireless facility in the specified portion or the right-of-way, to the extent specified <br />therein, provided that such permit shall remain in effect for the length of time the facility is in <br />use, unless lawfully revoked. <br /> <br />(B) Permit extensions. No person may excavate or obstruct the right-of-way beyond the date or dates <br />specified in the permit unless the person makes both a supplementary application for another right-of- <br />way permit before the expiration of the initial permit, and a new permit or permit extension is granted. <br /> <br />(C) Delay penalty. The city shall establish and impose a delay penalty for unreasonable delays in right-of- <br />way excavation, obstruction, patching or restoration. The delay penalty shall be established from time to <br />time by City Council resolution. <br /> <br />(D) Permit display. Permits issued under this subchapter shall be conspicuously displayed or otherwise <br />available at all times at the indicated work site and shall be available for inspection by city. <br /> <br />(E) No permit required. A small wireless facility permit is not required, nor any permit fee or collocation <br />agreement in order to conduct any of the following activities: <br /> <br />(1) Routine maintenance of a small wireless facility; <br /> <br />(2) Replacement of a small wireless facility with a new facility that is substantially similar or <br />smaller in size, weight, height, and wind or structural loading than the small wireless facility <br />being replaced; or <br /> <br />(3) Installation, placement, maintenance, operation, or replacement of micro wireless facilities that <br />are suspended on cables strung between existing utility poles in compliance with national safety <br />codes. <br /> <br />126tğŭĻ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.