My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-08-17 EDA Packet
Centerville
>
EDA
>
Agenda Packets
>
2022
>
2022-08-17 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2022 3:28:45 PM
Creation date
8/15/2022 9:42:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMUNITY ENGAGEMENT <br />Web Site <br />• Administrator's Report uploaded <br />• Committee Agendas/Packets uploaded <br />• Community Notification of City Hall Phone <br />Issues <br />Reader Board <br />• Meeting Schedules <br />• Community Events <br />• Parks Programming <br />• Elections <br />SEWER AND WATER <br />Social Media <br />• Meeting Agenda <br />• Public Hearings <br />• Parks Programming <br />• Elections <br />Community Email List <br />• Administrator's Report <br />• Meeting Agenda <br />Commercial Water Connection Fee Assistance <br />At the last City Council meeting, the Council voted to extend the program through the end of 2023. The <br />program offers half -priced hook-up charges for businesses hooking to city water. <br />Wellhead Protection Plan <br />The Minnesota Department of Health held a kick-off meeting with city staff and consultants for the <br />implementation of the city's Part-2 Wellhead Protection Plan. The group reviewed items in the documents <br />and the timelines associated with various activities. Staff will be following up on the action items over the <br />course of the next few months. <br />Well #2 Repairs <br />The city's primary well (Well 92) started having some electrical problems a few months ago. Several weeks <br />ago, those problems got worse and ended up necessitating having the 14-year old pump and motor replaced, <br />along with the Variable Frequency Drive which runs the motor. In total, costs for the replacement of these <br />components amounted to just under $25,000. City staff made the decision to replace these elements in short <br />order, without bringing them before the council for a number of reasons. First, having the city's primary <br />well out of service during the heat of the summer, is not a desireable situation. Secondly, some of the parts <br />were in and out of back -order status and staff felt it wise to move while they were available on a timely <br />basis. <br />We are happy to report that, during this outage, our redundant systems performed very well. The city's <br />secondary well (Well 91) was able to keep up and the chemical and monitoring equipment at that well <br />performed as expected. Additional redundancies, in our two interconnections to the Lino Lakes water system <br />were double checked and stood at the ready. However, they were never needed, due to the adjustments made <br />by our public works department and the performance of our back-up well. <br />This situation was a reminder of the many things that go on behind the scenes to ensure our sewer and water <br />customers have reliable and safe service. Our staff and built-in redundant systems performed well and we <br />were glad to have them both at the ready. <br />
The URL can be used to link to this page
Your browser does not support the video tag.