Laserfiche WebLink
<br /> <br />CHAPTER157:STORMWATER <br />MANAGEMENTEROSIONCONTROL <br />Section <br />General <br />157.01 Intent <br />157.02 Statutory authorization <br />157.03 Findings <br />157.04 Purpose <br />157.05 Scope and effect <br />157.06 Definitions <br />Stormwater Pollution Prevention Plan <br />157.15 Submittal procedures <br />157.16 Review process <br />157.17 Minimum construction site best management practices <br />157.18 Completion of work <br />157.19 Enforcement procedures <br /> <br />Post-Construction Stormwater Management <br /> <br />157.20 Stormwater Management Plan <br />157.21 Design Standards <br />157.22 Drainage <br />157.23 Calculations <br />157.24 Volume Control and Pollutant Management <br />157.25 Impaired Waters and Total Maximum Daily Loads <br />157.26 Industrial Sites <br />157.27 Wetlands <br />157.28 Maintenance of Stormwater BMPÓs <br />157.29 through 157.31 reserved for future use <br />157.32 Alterations to and Use of Public and Private Stormwater Ponds <br />157.33 Appropriates from Stormwater Ponds <br />157.34 Reserved for future use <br />157.35 Rain Gardens in Road Right of Way <br />157.36 through 157.98 reserved for future use <br /> <br />157.99 Penalty <br /> <br />401 |Page <br /> <br /> <br />