Laserfiche WebLink
CHAPTER157:STORMWATER <br />MANAGEMENTEROSIONCONTROL <br />Section <br />General <br />157.01Intent <br />157.02Statutory authorization <br />157.03Findings <br />157.04Purpose <br />157.05Scope and effect <br />157.06Definitions <br />Stormwater Pollution Prevention Plan <br />157.15Submittal procedures <br />157.16Review process <br />157.17Minimum construction site best management practices <br />157.18Completion of work <br />157.19Enforcement procedures <br />Post-Construction Stormwater Management <br />157.20Stormwater Management Plan <br />157.21Design Standards <br />157.22Drainage <br />157.23Calculations <br />157.24Volume Control and Pollutant Management <br />157.25Impaired Waters and Total Maximum Daily Loads <br />157.26Industrial Sites <br />157.27Wetlands <br />157.28Maintenance of Stormwater BMP’s <br />157.29through 157.31 reserved for future use <br />157.32Alterations to and Use of Public and Private Stormwater Ponds <br />157.33Appropriates from Stormwater Ponds <br />157.34Reserved for future use <br />157.35Rain Gardens in Road Right of Way <br />157.36through 157.98 reserved for future use <br />157.99 Penalty <br />401|Page <br /> <br />