Laserfiche WebLink
Page5 of5 <br />City of Centerville <br />Client Project Number: <br />1880 Main Street <br />Payment Number: 2 <br />Centerville , MN 55038 <br />Project Category Totals <br />ProjectCategoryAmount This RequestAmount To Date <br />193805625PART A: THIN BITUMINOUS$153,733.33$499,944.01 <br />OVERLAY <br />193805625PART B: CITY HALL$93,811.72$197,694.70 <br />PARKING LOT <br />QuantityAmount <br />ContractQuantity ToAmount To <br />LineDescriptionUnitsUnit <br />CCCC# <br />ThisThis <br />QuantityDateDate <br />Price <br />RequestRequest <br />CCOMMON <br />CY <br />1 5927.00800.00254.00 <br />OEXCAVATION <br />CAGGREGATE BASE <br />TN <br />16028.001000.004.5126.00 <br />OCLASS 5 <br />C <br />SF <br />1614" CONCRETE WALK12.0021600.001852,220.00 <br />O <br />C <br />SY <br />162RESTORATION5.005046230.0046230.00 <br />O <br />CCOMMON <br />CY <br />16327.001051052,835.001052,835.00 <br />OEXCAVATION (EV) <br />CGEOTEXTILE FABRIC <br />SY <br />1643.503153141,099.003141,099.00 <br />OTYPE 5 <br />CAGGREGATE BASE <br />TN <br />16528.001151494,172.001494,172.00 <br />OCLASS 5 <br />C <br />SY <br />166RESTORATION5.0078000.0000.00 <br />O <br />PAVEMENT MESSAGE, <br />C <br />EA <br />167LEFT TURN ARROW -135.0011135.001135.00 <br />O <br />EPOXY <br />PAVEMENT MESSAGE <br />C <br />EA <br />168(LEFT-THRU ARROW)204.0011204.001204.00 <br />O <br />EPOXY <br />Contract Change Totals:$8,675.00$11,075.00 <br />Contract Total$708,713.71 <br />Contract Change Totals <br />NumberDescriptionAmount ThisAmount To Date <br />Request <br />1Part A: Construction of concrete walk between the City Hall main entrance8,675.0011,075.00 <br />and Fire Station door <br />Part B: Excavation and construction of gravel base for proposed trail <br />between Old Mill Court and Laramee Lane <br />Part C: Installation of turn lane arrows on Centerville Road north of Main <br />Street (CSAH 14) <br /> <br />