Laserfiche WebLink
The developer’s landscaping crew has finished work on the shoreline treatments and will be addressing <br />other landscaping items from the punch list. <br /> <br />(8) Atlas Villas Memory Care Project (1825 Main Street) <br />A Certificate of Occupancy was granted to the facility by the city’s building department. The <br />management company is working on their licensure, through the state and county, prior to opening their <br />doors. <br /> <br />(10-14)Rehbein Commercial <br />The contractor is working on punch list items including boulevard restoration. The final lift of asphalt <br />will be paved in September. <br /> <br />(13) Kwik Trip <br />Construction on the site is in full swing, with gas tanks installed this week along with footings for the <br />canopies. Site grading and turn lane construction will continue in the coming weeks. The store anticipates <br />opening around the end of December. <br /> <br />(11) Norbella Senior Living <br />A full Certificate of Occupancy has been issued. The site work and building construction are complete. <br />The management company is now working through staffing and licensure issues. Look for a grand <br />opening in the near future. <br /> <br />(2) Peterson Shores <br />Staff met with a prospective builder on site to discuss sewer and water connections as well as grading and <br />driveway issues. <br /> <br />(17, 19) Rehbein Industrial <br />The developer’s contractor continues to work on minor punch list itemsand will need to patch the base <br />course of paving where the water main connection was made. The city is working with the developer on <br />a plan to delay the wear course paving until 2023. <br /> <br />(19) Sutton Transport <br />Portions of the site’s parking and driveway areas have been paved. Further paving will be completed next <br />week. Landscaping crews are also beginning their work to finish off the site. <br /> <br />(15) 2050/2070Main Street – AmericanRoofing Supply <br />Landscaping crews have finished their work and the site is fully paved and ready for operations. Gates at <br />the two entrances are being fabricated and will be installed soon. <br /> <br />(18) Max Storage (Fairview Street) <br />The Conditional Use Permit (CUP) has now been sent in to the County for recording and a grading permit <br />has been issued.The building permit is imminent as soon as plumbing and mechanical plans are finalized. <br />(17)AmazonFulfillmentCenter <br />Grading, utilities, parking lot and building pad construction are all moving along, on schedule. Water <br />st <br />main installation along 21Ave. is now complete. <br /> <br />A kick-off meeting for the Corridor Study has been set for next week. Thestudy will prioritize area-wide <br />transportation improvements to address increased traffic from Amazon and surrounding growth. <br /> <br />