My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-28 Administrator's Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2018-2022
>
2022
>
2022-09-28 Administrator's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2022 5:40:00 AM
Creation date
12/9/2022 5:39:50 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction on the site is in full swing, with the block and steel framing of the building going up this <br />week. A fiber optic line is being relocated, which needs to happen before turn lane construction can <br />continue. The store anticipates opening around the end of December. <br />(11) NorbellaSeniorLiving <br />A grand opening is scheduled for October 13 at 10:00 AM. The public is welcome to come and take a <br />tour of the new facility. <br />(2)PetersonShores <br />Staff met with a prospective builder on site to discuss sewer and water connections as well as grading and <br />driveway issues. <br />(17, 19) RehbeinIndustrial <br />The developer’s contractor continues to work on minor punch list itemsand will need to patch the base <br />course of paving where the water main connection was made. The city is working with the developer on <br />a plan to delay the wear course paving until 2023. <br />(19) SuttonTransport <br />Paving and landscaping work are complete and a final inspection has been scheduled. <br />(15) 2050/2070 MainStreet – American Roofing Supply <br />Landscaping crews have finished their work and the site is fully paved and ready for operations. Gates at <br />the two entrances are being installed. <br />(18) Max Storage (FairviewStreet) <br />The Conditional Use Permit (CUP) has now been sent in to the County for recording and a grading permit <br />has been issued.The building permit is imminent as soon as plumbing and mechanical plans are finalized. <br />(17) Amazon FulfillmentCenter <br />Grading, utilities, parking lot and building pad construction are all moving along, on schedule. Water <br />st <br />main installation along 21 Ave. is now complete. <br />A kick-off meeting for the Corridor Study has been held. The study will prioritize area-wide transportation <br />improvements to address increased traffic from Amazon and surrounding growth. The study will examine <br />st <br />20th Avenue from Birch Street to 80th Avenue, and the intersection of 21 Ave. and Main Street. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.