Laserfiche WebLink
TABLE A33B - GRADING PERMIT FEES* FEE <br />0 to 100 cubic yards (40 m3 to 76.5 m3) $60.00 <br /> 101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - $60.00 for the first 100 cubic yards <br /> (76.5 m3), plus $27.56 for each additional 100 cubic yards (76.5 m3) or fraction thereof. <br /> 1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) - $308.04 for the first 1,000 cubic yards <br /> (764.6 m3), plus $22.84 for each additional 1,000 cubic yards (764.6 m3) or fraction thereof. <br /> 10,001 to 100,000 cubic yards (7,646.3 m3 to 7,645.5 m3) - $513.60 for the first 10,000 cubic <br /> yards (7,645.5 m3), plus $103.95 for each additional 10,000 cubic yards (7,645.5 m3) or <br /> fraction thereof. <br /> 100,001 cubic yards (7,645.6 m3) or more - $1,449.15 for the first 100,000 cubic yards <br /> (7,645.5 m3), plus $57.49 for each additional 10,000 cubic yards (7,645.5 m3) or fraction <br /> thereof. <br />Other Inspections and Fees: <br />1. Inspections outside of normal business hours $90.00/hour <br /> (Min. Charge Î two hours) <br />2. Reinspection fees assessed under provision of §108.8 $70.00/hour <br />3. Inspections for which no fee is specifically indicated $70.00/ hour <br /> (Min. Charge Î one-half hour) <br />*The fee for a grading permit authorizing additional work to that under a valid permit shall be the <br />difference between the fee paid for the original permit and the fee shown for the entire project. <br /> <br />**Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include <br />supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. <br />Page 21 of 22 <br /> <br />