My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-12 Administrator Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2023
>
2023-04-12 Administrator Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 7:44:02 AM
Creation date
4/17/2023 7:44:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(17, 19) Rehbein Industrial <br />Record Plans for the project have been submitted and reviewed. Once permit closure is achieved, the project <br />can be closed out. <br /> <br />(18) Max Storage (Fairview Street) <br />A building permit has now been issued for construction of Building #1 of 2. The developers have decided to <br />wait until spring to begin construction. <br /> <br />(17) Amazon Fulfillment Center <br />Roofing and interior work continue as progress on the building has been steady. Exterior lighting, including <br />both on-building lights and parking lot lights have been completed and are now on during the night. <br /> <br />Submittal of the modeling data and application for changes to the Floodway have now been submitted to <br />FEMA. The federal agency has 90 days to respond to our submittal. <br /> <br />Development Inquiries <br /> Residential Developer exploring opportunities on Block 7 <br /> Existing industrial business looking to expand or build new and lease out old space <br /> Building owner, looking to remodel downtown retail space for new tennant <br /> <br />PUBLIC WORKS <br />Commercial Water Connection Fee Assistance <br />At the last City Council meeting, the Council voted to extend the program through the end of 2023. The <br />program offers half-priced hook-up charges for businesses hooking to city water. <br /> <br />th <br />20 Avenue (CSAH 54) Corridor Study <br />The latest progress meeting for the Corridor Study was held on February 13. Stakeholders were shown <br />concept maps, laying out potential intersection treatments, access modifications, street cross sections, speed <br />limits, and pedestrian routes. <br /> <br />Next, the team will be reaching out to key area land and business owners along the corridor to gain their <br />perspectives on various alternatives. Following those meetings, the concept layouts will be adjusted and <br />readied for a broader public input phase. <br /> <br />st <br />The study is examining 20th Avenue from Birch Street to 80th Avenue, and the intersection of 21 Ave. and <br />Main Street, aimed at identifying improvements needed in the short and long-term to accommodate regional <br />growth. <br /> <br />Wellhead Protection Plan <br />The Minnesota Department of Health held a kick-off meeting with city staff and consultants for the <br />implementation of the cityÓs Part-2 Wellhead Protection Plan. The group reviewed items in the documents <br />and the timelines associated with various activities. Staff will be following up on the action items over the <br />course of the next few months. <br /> <br />City staff recently completed final paperwork and receive reimbursement from the Department of Health <br />associated with a grand for sealing of a well in the downtown at no cost to the city or resident. With the <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.