stnd <br />(3)(4) Old Mill Estates 1 and 2 Additions <br />The developer recently shared an update from their contractor who plans to complete their remaining <br />punch list items in early May. Other development-wide punch list items remain for the developer to <br />complete. <br />Construction of the gravel base for the trail between Old Mill Court and Laramee Lane is now complete. <br />Concrete work will be completed in the spring to ensure the base has a chance to settle over the winter. <br />(16) Centerville Storage <br />The facility is now open for business. The developer has made progress to address drainage issues along <br />the north side of the facility and will continue to work on minor clean-up items. <br />(1) Bay View Villas (Waterworks Site) <br />The developer’s landscaping crew has finished sod work near the cul-de-sac and has just a few items from <br />the punch list remaining. <br />(10-14) Rehbein Commercial <br />thst <br />The sidewalk on the north side of Main Street, between 20 Avenue and 21 Avenue will be graded and <br />poured in the spring. Other punch list items remain. Record plans have been submitted and reviewed. <br />(13) Kwik Trip <br />Sidewalk construction will begin as soon as the County is able to move some of their signs to their new <br />locations. <br />(17, 19) Rehbein Industrial <br />Record Plans for the project have been submitted and reviewed. Once permit closure is achieved, the project <br />can be closed out. <br />(18) Max Storage (Fairview Street) <br />Erosion control devices are in place and grading has begun on the site. <br />(17) Amazon Fulfillment Center <br />Exterior work, including curb and gutter, and prepping the gravel base for paving are underway. The project <br />team reports that they are still on schedule to be complete and ready to hand the building over to Amazon in <br />early August. <br />Submittal of the modeling data and application for changes to the Floodway have now been submitted to <br />FEMA. The federal agency has 90 days to respond to our submittal. <br />Development Inquiries <br />None <br />PUBLIC WORKS <br />2022 Consumer Confidence Report <br />The City’s 2022 Consumer Confidence Report is available online at the City’s website. <br />Here is a link: https://tinyurl.com/8w3344fk, utilize the QR Code to the right or request <br />a copy from City Hall by calling: 651-792-7933. <br /> <br />