Laserfiche WebLink
... 'C! kw <br />10503 - 89th Avenue North <br />Maple Grove, MN 55369 <br />www.alliedblacktopmn.com <br />Company Name: <br />City of Centerville <br />Billing Address: <br />1880 Main St <br />Centerville, M 55038 <br />Contact Person: <br />Paul Palzer <br />Phone: <br />651-429-4750 <br />Email: <br />spalzet@centervillemn.com <br />Matt Dolecki <br />Phone: 763-425-0575 <br />Cell: 612-834-0168 <br />Email: In.doleckiallied black topmn.com <br />Proposal <br />Date: May 31, 2023 <br />Project Name: 2023 Crack Filling Project <br />Project Address: <br />Project Contact Person: Paul Palzer <br />Phone: 651-429-4750 <br />Email: pAalzer@centervillemn.com <br />We hereby submit specifications and quotations farthe following: <br />Description of Work to be Performed Unit Qty. Unit Price Price INT <br />Crack Sealing: L.F. 55000 $1.38 $76,900.00 <br />Crack Seal city streets per city supplied specifications and map <br />Exclusions: Balls, permks, fees, surveying, engineering, testing, rail road insurance, special Insurance, site specific training for employees, landscaping, Irrigation, watering of sod, soit corrections, dewatering, <br />traffic control, utility or stmctural sheeting, shoring, underpinning, buded debris, rock a —flon, class V base materials, drain tile, fooling Insulation or waterpmofhg, separation fabrics, vapor barriers, drainage <br />layers, hazardous materials, removal of contaminated soils, haul road construction, erosion control, site restoration, gas, mechanical, or electrical excavation, site fencing, locallg private Mates, <br />private utility repairs, winter or cold weather conditions, night or weekend work, winter conditions <br />Note: See Allied Blacktop Warranty Terms, Qualifications, and Construction Specifications. <br />Note: Contracted prices are subject to re -pricing if the WTI oil pricing exceeds $125/Barrel at time of delivery <br />We propose to fumish material and labor, complete in accordance with the above specifications, for the total lump sum of: <br />TOTAL ALL: $75,800.06 <br />ADD 1 % Bonding if Necessary <br />Payment terms are net 30 days. Payment terms for chip seal applications are 90 % due net 30 days, balance due upon completion of sweeping <br />Note: This proposal may be withdrawn if not accepted within 15 days Any alteration or deviation from the above specifications involving extra costs will be executed only upon written <br />orders, and will become an extra charge over and above the estimate. All agreements are contingent upon strikes, accidents, weather or other delays beyond our control <br />Allied Inc to carry proper insurance including Workers Compensation <br />Authorized Signature: "M*t Dofcclr� <br />Acceptance of Proposal: The above prices, specifications, conditions, and attached warranty qualifications are satisfactory and are hereby <br />accepted You are authorized to do the work as specified Payment will be made as outlined above <br />Date of Acceptance: Signature: <br />