... 'C! kw
<br />10503 - 89th Avenue North
<br />Maple Grove, MN 55369
<br />www.alliedblacktopmn.com
<br />Company Name:
<br />City of Centerville
<br />Billing Address:
<br />1880 Main St
<br />Centerville, M 55038
<br />Contact Person:
<br />Paul Palzer
<br />Phone:
<br />651-429-4750
<br />Email:
<br />spalzet@centervillemn.com
<br />Matt Dolecki
<br />Phone: 763-425-0575
<br />Cell: 612-834-0168
<br />Email: In.doleckiallied black topmn.com
<br />Proposal
<br />Date: May 31, 2023
<br />Project Name: 2023 Crack Filling Project
<br />Project Address:
<br />Project Contact Person: Paul Palzer
<br />Phone: 651-429-4750
<br />Email: pAalzer@centervillemn.com
<br />We hereby submit specifications and quotations farthe following:
<br />Description of Work to be Performed Unit Qty. Unit Price Price INT
<br />Crack Sealing: L.F. 55000 $1.38 $76,900.00
<br />Crack Seal city streets per city supplied specifications and map
<br />Exclusions: Balls, permks, fees, surveying, engineering, testing, rail road insurance, special Insurance, site specific training for employees, landscaping, Irrigation, watering of sod, soit corrections, dewatering,
<br />traffic control, utility or stmctural sheeting, shoring, underpinning, buded debris, rock a —flon, class V base materials, drain tile, fooling Insulation or waterpmofhg, separation fabrics, vapor barriers, drainage
<br />layers, hazardous materials, removal of contaminated soils, haul road construction, erosion control, site restoration, gas, mechanical, or electrical excavation, site fencing, locallg private Mates,
<br />private utility repairs, winter or cold weather conditions, night or weekend work, winter conditions
<br />Note: See Allied Blacktop Warranty Terms, Qualifications, and Construction Specifications.
<br />Note: Contracted prices are subject to re -pricing if the WTI oil pricing exceeds $125/Barrel at time of delivery
<br />We propose to fumish material and labor, complete in accordance with the above specifications, for the total lump sum of:
<br />TOTAL ALL: $75,800.06
<br />ADD 1 % Bonding if Necessary
<br />Payment terms are net 30 days. Payment terms for chip seal applications are 90 % due net 30 days, balance due upon completion of sweeping
<br />Note: This proposal may be withdrawn if not accepted within 15 days Any alteration or deviation from the above specifications involving extra costs will be executed only upon written
<br />orders, and will become an extra charge over and above the estimate. All agreements are contingent upon strikes, accidents, weather or other delays beyond our control
<br />Allied Inc to carry proper insurance including Workers Compensation
<br />Authorized Signature: "M*t Dofcclr�
<br />Acceptance of Proposal: The above prices, specifications, conditions, and attached warranty qualifications are satisfactory and are hereby
<br />accepted You are authorized to do the work as specified Payment will be made as outlined above
<br />Date of Acceptance: Signature:
<br />
|