My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-06-21 EDA Packet
Centerville
>
EDA
>
Agenda Packets
>
2023
>
2023-06-21 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2023 5:15:00 AM
Creation date
6/19/2023 5:12:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kwik Trip <br />Landscaping work has begun and should be wrapped up in the next week or two. <br />Rehbein Industrial <br />Record Plans for the project have been submitted and reviewed. Once permit closure is achieved, the project <br />can be closed out. <br />Max Storage (Fairview Street) <br />Grading has been completed. Sewer and water to Building #1 have been completed. Foundations will be <br />poured the week of 5/22. <br />Amazon Fulfillment Center <br />Exterior work, including curb and gutter, and prepping the gravel base for paving are underway. The project <br />team reports that they are still on schedule to be complete and ready to hand the building over to Amazon in <br />early August. <br />Submittal of the modeling data and application for changes to the Floodway have now been submitted to <br />FEMA. The federal agency has 90 days to respond to our submittal. <br />The Amazon sign was installed on the building this week. <br />Development Inquiries <br />Downtown landowner looking to develop approximately 3-acre site. <br />th <br />20 Avenue (CSAH 54) Corridor Study <br />The consultant has signed a supplemental agreement with the county to facilitate a public engagement <br />component for the project, which will allow stakeholders to give input on concept maps, potential <br />intersection treatments, access modifications, street cross sections, speed limits, and pedestrian routes. <br />st <br />The study is examining 20th Avenue from Birch Street to 80th Avenue, and the intersection of 21 Ave. and <br />Main Street, aimed at identifying improvements needed in the short and long-term to accommodate regional <br />growth. <br />City Hall Parking Lot Lighting <br />The City Council awarded a contract to complete the parking lot lighting project, contingent upon a grant <br />award through the Occupational Safety and Health Administration (OSHA).The city was unsuccessful in <br />obtaining the first round of awards but will be submitting again in a month or two. The city has re-submitted. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.