My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-06-28 Admin. Report
Centerville
>
City Council
>
City Administrator Weekly Updates
>
2023
>
2023-06-28 Admin. Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2023 11:57:42 AM
Creation date
6/26/2023 11:57:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bay View Villas (Waterworks Site) <br />The developerÓs landscaping crew has finished sod work near the cul-de-sac and has just a few items from <br />the punch list remaining. <br /> <br />Rehbein Commercial <br />thst <br />The sidewalk on the north side of Main Street, between 20 Avenue and 21 Avenue has been installed. <br />Other punch list items remain. <br /> <br />Kwik Trip <br />Landscaping work has begun and should be wrapped up in the next week or two. <br /> <br />Rehbein Industrial <br />Record Plans for the project have been submitted and reviewed. Once permit closure is achieved, the project <br />can be closed out. <br /> <br />Max Storage (Fairview Street) <br />Grading has been completed. Sewer and water to Building #1 have been completed. Foundations have been <br />poured. The footings are being completed and the walls are being built. <br /> <br />Amazon Fulfillment Center <br />Exterior work, including curb and gutter, and prepping the gravel base for paving are underway. The project <br />team reports that they are still on schedule to be complete and ready to hand the building over to Amazon in <br />early August. <br /> <br />Submittal of the modeling data and application for changes to the Floodway have now been submitted to <br />FEMA. The federal agency has 90 days to respond to our submittal. <br /> <br />The Amazon sign has been installed on the building. <br /> <br />Development Inquiries <br /> Downtown landowners looking to develop approximately 3-acre site. <br /> <br />th <br />20 Avenue (CSAH 54) Corridor Study <br />The consultant has signed a supplemental agreement with the county to facilitate a public engagement <br />component for the project, which will allow stakeholders to give input on concept maps, potential <br />intersection treatments, access modifications, street cross sections, speed limits, and pedestrian routes. <br /> <br />st <br />The study is examining 20th Avenue from Birch Street to 80th Avenue, and the intersection of 21 Ave. and <br />Main Street, aimed at identifying improvements needed in the short and long-term to accommodate regional <br />growth. <br /> <br />City Hall Parking Lot Lighting <br />The City Council awarded a contract to complete the parking lot lighting project, contingent upon a grant <br />award through the Occupational Safety and Health Administration (OSHA). The city was unsuccessful in <br />obtaining the first round of awards but will be submitting again in a month or two. The city has re-submitted <br />th <br />for the June 15 deadline, and we anticipate hearing back in the next couple of weeks. <br /> <br />COMMUNITY ENGAGEMENT (May 2023) <br />Web Site (1,700 Unique Visitors, 2,100 Total Visits) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.