My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-19 EDA Packet
Centerville
>
EDA
>
Agenda Packets
>
2023
>
2023-07-19 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 10:06:37 AM
Creation date
7/13/2023 10:05:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XV. INELIGIBLE COSTS (LOAN PROGRAM) <br />The following costs are ineligible: <br /> Refinancing of existing debts <br /> Non-fixed improvements <br /> Working capital <br /> Inventory <br /> Sweat equity (payment for the applicantÓs own labor and performance for construction of <br />improvements) <br /> Internal improvements to mixed use buildings that involve the residential portion of the <br />structure <br />XVI. GRANT PROGRAM <br />In order to encourage building façade and streetscape improvements that are more aesthetic in <br />nature, grants between $2,000 and $5,000 are available provided there is a 1:1 match of private <br />investment. For example, to qualify for a grant of $2,000, a total of $4,000 must be spent. For a <br />$10,000 project, the maximum of $5,000 in grant money may be awarded. <br />Multiple grants are permitted consistent with the above outlined formula, but shall not exceed <br />$5,000 per project, or a total of $5,000 per property, in a 5-year period. <br /> <br />For signage, 50% of the cost toward the sign will be paid on day one and the other 50% will be <br />paid after one year, on day 366 if the business is still operational. <br /> <br />XVII. ELIGIBLE COSTS (GRANT PROGRAM) <br /> <br />The following are eligible expenses for either the public or private sector (matching) portion of <br />the grant. <br /> <br /> Generally, all work on front and sides of business buildings facing public streets <br /> Façade masonry repairs <br /> Repairing, replacing and installing of cornices, entrances, exterior doors and windows, <br />decorative details, awnings and exterior lighting <br /> New signage <br /> Sign removal, repairing and replacement <br /> Building identification <br /> Streetscape costs on private property <br /> Landscaping visible from the street <br /> Decks or patios used for business purposes <br />8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.