My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-26 *REVISED* CC Packet & Set Agenda
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2023
>
2023-07-26 *REVISED* CC Packet & Set Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2023 9:49:51 AM
Creation date
7/26/2023 3:35:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
open on July 25, with a grand opening set for August 31. <br />1737 Main Street (Block 3) <br />The city was awarded a grant to complete soils and environmental reports for their property at 1737 Main <br />Street. As we continue to work with our prospective developer, this information will help guide their final <br />design. Currently, the developer is working to address parking and architectural comments from their <br />review at the Planning and Zoning Commission. We anticipate a resubmittal of drawings in the coming <br />weeks. <br />Old Mill Estates lst and 2nd Additions <br />Most items are now complete. We are awaiting close-out of the wetland and watershed permits, prior to <br />releasing securities. <br />Centerville Storage <br />The facility is now open for business. The developer has completed drainage corrections along the north <br />side of the facility and will continue to work on watershed permit close-out. <br />Bay View Villas (Waterworks Site) <br />The developer's landscaping crew has begun work near the dock access area. Watershed permit closure is <br />also required, prior to release of the development securities. <br />Rehbein Commercial <br />The sidewalk on the north side of Main Street, between 201h Avenue and 2 1 " Avenue has been installed. The <br />developer is working on final turf establishment and is working with staff to adjust their security to cover <br />the warranty period. The developer has also reestablished positive balances in their escrow accounts, which <br />will be held open until all securities have been released. <br />Kwik Trip <br />Work is complete. We are working with the developer to close out the project. <br />Rehbein Industrial <br />Record Plans for the project have been submitted and reviewed. Once permit closure is achieved, the project <br />can be closed out. <br />Max Storage (Fairview Street) <br />Grading has been completed. Sewer and water to Building 41 have been completed. Foundations have been <br />poured. The footings are being completed and the walls are being built. <br />Amazon Fulfillment Center <br />On July 11, a Certificate of Occupancy was issued for the building, by our Building Inspection department! <br />Most site work, including, curb, paving, striping, signage and landscaping is now complete. The contractor <br />
The URL can be used to link to this page
Your browser does not support the video tag.