Laserfiche WebLink
o Flush hydrants city wide <br />o Exercise all gate valves <br />o Repair gate valves/ extensions <br />o Paint 40% of hydrants <br /> Sanitary sewer: <br />o Reset /ramp approx. 30 manholes <br /> Storm sewer: <br />o Clean/inspect/repair all ponds and outlets required for MS4 reporting <br />o Clean catch basins city wide after all storm events <br /> Streets: <br />o Patched city wide as needed <br />o Replaced old/damaged signs as needed <br />o Repainted cross walks <br /> Parks and Trails: <br />o Replaced old garbage receptacles with new dual units <br />o Repainted pickle ball court <br />o Weed removal city wide <br />o Brushed back problem areas city wide <br />o Patched as needed <br />o Continuous weeding/pruning downtown area <br /> Special projects: <br />o New landscaping behind city hall <br />o Relocated monument sign at Tracy McBride park <br />o Paint salt shed at public works <br />o Assist with city events: <br /> Fete des Lacs <br /> Music in the Park <br /> Main Street Market <br /> <br />Sidewalk Repairs <br />The cityÓs contractor has begun work on sidewalk repairs at various <br />locations around town. In total, more than 240 broken panels will be <br />replaced, making our city a much safer place to walk. <br /> <br />Water Tower Repairs <br />The cityÓs contractor is working on <br />spot repairs to the water towerÓs <br />coating system (paint). The work <br />will take about 3 weeks, weather <br />dependent. Can you spot the <br />worker on the tower? <br /> <br />Public Works Truck <br />Replacements <br />Public Works Director, Paul Palzer spoke with the Chevy Dealer who <br />represents the state bid for their trucks and was able to place our order <br />for the three trucks identified in our Capital Replacement Plan. There <br />is, however, talk of a labor union strike which could affect the order <br />and/or delivery timeframe. <br /> <br /> <br /> <br />