My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2023
>
2023-12-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 7:46:22 AM
Creation date
12/11/2023 7:45:52 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.Feasibility Period: <br />For a period from December 13, 2023,untilDecember 14, 2024,or until and if the <br />the private party is terminated <br />,the parties will perform their due diligence toward the purposes of this <br />Memorandumof Understanding. Overall, the considerationof Tax Increment <br />Financing is contingent on the Developer attaining the requirementsof a Tax <br />Increment FinancingDistrictbased on the redevelopment of the Property. <br />2.General Terms: <br />General TIF parameters: <br />A minimum period of approximately10to 15years with the <br />final duration of the TIF Districtand Net Present Value of the <br />TIF Note as maybe determined in afuture Development <br />Agreement, TIF Agreement,and/orTIF Noteor other <br />documents as may be required for the establishment of the <br />TIF District. <br />An approximate and estimated maximum of $2,500,000.00in <br />Net Present Value. <br />Reimbursementismade from tax increment revenues as <br />received,as taxes are paidannuallyPay-as-you-go.) <br />General Building ExpectationsFor The Property(the Minimum <br />Improvements). <br />Approximately 90to110units ofmarket-rate apartments. <br />Building height limitsper Code. <br />Underground parking ratio of approximately0.9:1 to 1:1. <br />Overall parking ratio of approximately 1.5 to1.7. <br />Architectural requirements based on the City of Centerville <br />Downtown Master Plan. <br />Expected initial valuation of theProperty of no less than <br />$17,000,000.00. <br />Development Property, amenitiesinclude: <br />o Project will have high-qualityinterior and exterior <br />materials. <br />o Varied facade treatment and mix ofmaterials and <br />colors. <br />o Projections and recesses will be designedthroughout <br />the building and at theprominent corners. <br />o Decorative exterior lighting and fixtures. <br />tğŭĻ Ћ <br /> <br />ĻƩƭźƚƓ ЊЋΉЉБΉЋЉЋЌΏЋ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.