Laserfiche WebLink
1. WhenaNationalPollutantDischargeEliminationsSystem/StateDisposal <br />System(NPDES/SDS)Permitisrequiredandproofofcoverage <br />a. Mustobtainastatepermit.The applicant ofconstructionactivitymustapplyfor <br />coverageundertheMinnesotaPollutionControl!ŭĻƓĭǤ͸ƭΛat/!͸ƭΜConstruction <br />StormwaterPermit(PermitNo:MNR100001).A CityofCentervillepermit willnotbe <br />issueduntilcoverageundertheat/!͸ƭConstructionStormwaterPermithasbeen <br />obtainedbytheapplicant. <br />b.Otherrequiredpermits.Forcertainconstructionactivity,variousotherpermitsmay <br />alsoberequired.The applicant ofconstructionactivityisresponsibleforobtainingany <br />otherrequiredpermitsfrom theCityofCenterville andotherState,Federal,orlocal <br />governmentalagencieshavinganyauthorityovertheworktobeperformed.Typically,such <br />agenciesmayinclude,butarenotlimitedto,theU.S.ArmyCorpsofEngineers,the <br />MinnesotaPollutionControlAgency,theMinnesotaDepartmentofNaturalResources,the <br />MinnesotaDepartmentofTransportation,andtheStateHistoricalPreservationOffice. <br />Note:Items1.a.andb.arediscretionaryandnotrequiredtomeettheMS4permitanditisuptothe <br />MS4iftheywouldliketoincludethemintheirordinance. <br />2. ConstructionSiteStormwaterRunoffControl <br />a. SitePlanReview ΝLƷĻƒЊВ͵ЎΞ <br />i. The applicant ofconstructionactivityshallsubmitacopyofthesiteplanaspartofthe <br />application forreviewandconfirmationthatordinancerequirementshavebeenmet. <br />ii. Ifthe application isdenied,andthe applicant wouldliketoproceedwiththeproject, <br />the applicant mustrevisethe application,includingthesiteplan,andresubmit. <br />iii. Oncea permit hasbeenissued/approved,thesiteplanbecomesanenforceable <br />document,andthe applicant mustcomplywithallrequirementsidentifiedinthesite <br />plan.The applicant isalsoresponsibleforkeepingthestormwaterrunoffcontrol <br />requirementsidentifiedinthesiteplanuptodate. <br />b. SitePlanRequirements ΝLƷĻƒЊВ͵ЎğƓķЊВ͵ЊЌΞ <br />i. Thesiteplanmustincludethefollowingprojectinformation. <br />1) Projectname <br />2) Locationoftheproject <br />3) Totalacreagetobedisturbed <br />4) Namesofthe applicant responsiblefortheproposedconstructionactivity <br />5) \[TheMS4mayinsertanyadditionalinformationthattheywouldrequireaspartof <br />theirapplication,i.e.checklists\] <br />March2024|wqstrm498 <br />Page 6 of 23 <br /> <br />