My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-12 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2024
>
2024-06-12 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2024 5:13:37 PM
Creation date
6/7/2024 5:13:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
()- <br />TAX INCREMENT FINANCING REDEVELOPMENT DISTRICT NO. 18 <br />6 <br /> <br />Procedures Followed <br /> <br />STRUCTURE ASSESSMENTS <br /> <br />The primary structures (non-out buildings) in the district, where access was <br />granted by the owner, were physically inspected by Mr. Palzer and Mr. Schmitz <br />on-site. Where access to the interior of the structure and the property was <br />denied, Mr. Palzer completed a desktop review of the property file to identify <br />likely deficiencies. <br /> <br />Physical Examination <br />The physical examinations performed by Mr. Palzer and Mr. Schmitz involved <br />interior and exterior inspections of the buildings, looking for elements of the <br />structure which do not meet current building code requirements. Common items <br />Inspection Report <br />of concern are updated: electrical, plumbing, heating and ventilation systems, <br />insulation and roofing. Other items of structural concern are stairway <br />clearences, roof lines, basement foundations, beam/joist systems and others. <br /> <br />Desktop Review <br />Mr. Palzer’s desktop review of city records involved looking for building permits <br />or other documentation that would reveal whether the home had been updated <br />since the date of major building code changes involving electrical, plumbing, <br />HVAC and the like. <br /> <br />LaLonde Property – Mr. Palzer and Mr. Schmitz examined the structure on <br />March 20, 2024 and returned on April 12, 2024 to take pictures of deficiencies. <br /> <br />Brilowski Property – Mr. Palzer and Mr. Schmitz examined and photographed <br />the structure on April 12, 2024. <br /> <br />Camp-Baron Property – The Camp-Barons did not respond to our mailed, written <br />request for an interior inspection. Mr. Palzer completed a review of the <br />property’s file on April 12, 2024. <br /> <br />There are no other primary structures within the district. <br /> <br />DRAFT AS OF JUNE 5, 2024 24 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.