My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-07-10 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
2024
>
2024-07-10 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 4:41:49 PM
Creation date
7/3/2024 4:41:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. Thesiteplanmustincludethelocation,type,andnarrativeofthefollowingbest <br />managementpractices(BMPs)consistentwithstandardsidentifiedinPart2.c.(Best <br />ManagementPractices(BMPs)Requirements) <br />1) Downgradientsedimentcontrols; <br />2) Soilstabilization(temporaryandpermanent); <br />3) Vehicletracking; <br />4) Inspectionandmaintenanceschedules;and <br />5) OtherBMPsasapplicable: <br />a) Areasthatarenottobedisturbed; <br />b) PhasingandstabilizationBMPsforsteepslopes; <br />c) Temporaryorpermanentditchesorswalesbeingusedas <br />sedimentcontainmentsystems; <br />d) Pipeoutletenergydissipation <br />e) BufferZonesincludingbutnotlimitedto: <br />i. Aminimumofa50footnaturalbuffer; <br />ii. Aminimumofa100footbufferzonefromͻƚƷŷĻƩspecialǞğƷĻƩƭͼͲ <br />ͻƦƩƚŷźĬźƷĻķǞğƷĻƩƭͼͲandͻƩĻƭƷƩźĭƷĻķǞğƷĻƩƭͼasdefined; <br />f) InletprotectionBMPs; <br />g) StockpileBMPs; <br />h) Dewateringandbasindraining; <br />i) TemporarySedimentationBasinsconsistentwithstandardsidentifiedinPart <br />2.d.(DesignCriteriaforTemporarySedimentBasins) <br />j) PollutionPreventionManagementBMPs <br />k) PermanentStormwaterManagementBMPs <br />c. BestManagementPractices(BMPs)Requirements ΝLƷĻƒЊВ͵ЌğƓķЊВ͵ЎΞ <br />i. ErosionPreventionPractices <br />1) Allareasnottobedisturbedmustbedelineatedbeforeworkbegins; <br />2) Allsteepslopesmustbeidentifiedinthesiteplananddisturbanceofthosesteep <br />slopesshouldbeminimized.Ifsteepslopesmustbedisturbed,techniquessuchas <br />phasingandstabilizationpracticesdesignedforsteepslopes(e.g.,slopedraining <br />andterracing)mustbeimplemented; <br />3) Allexposedsoilareas,includingstockpilesmustbestabilized; <br />a) Stabilizationmustbeinitiatedimmediatelytolimitsoilerosionwhen <br />constructionactivityhaspermanentlyortemporarilyceasedonanyportionof <br />thesiteandwillnotresumeforaperiodexceeding14calendardays(orseven <br />(7)calendardaysonaprojectthatiswithinonemile(aerialradius <br />measurement)of,andflowsto,oneormoreofthefollowing:ͻźƒƦğźƩĻķ <br />ǞğƷĻƩƭͼͲͻƚƷŷĻƩspecialǞğƷĻƩƭͼͲͻƦƩƚŷźĬźƷĻķǞğƷĻƩƭͼͲand/orͻƩĻƭƷƩźĭƷĻķǞğƷĻƩƭͼ <br />asdefined); <br />March2024|wqstrm498 <br />Page 7 of 23 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.