My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-23 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
2024
>
2024-10-23 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 4:22:07 PM
Creation date
10/18/2024 4:12:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF CENTERVILLE <br />REQUEST FOR <br />COUNCIL ACTION <br />e teryiCCe <br />Esta6Cished 1857 <br />Agenda Item # <br />Department: <br />Requested Council Meeting Date: <br />WS II.2 <br />Public Works <br />October 23, 2024 <br />TITLE OF ISSUE: <br />Fire Station Roof <br />BACKGROUND AND SUPPLEMENTAL INFORMATION: <br />We expect to hear whether or not our grant application was successful for placing solar panels on City Hall and <br />the Fire Station roofs, on Monday, October 21. If we are awarded a grant, we will need to decide whether or <br />not to replace the roofs, respectively, before the installation of the solar panels. Although the vendor we are <br />working with is not proposing any roof penetrations, there is a significant cost to "pick up" the solar panels and <br />reinstall them if we were to have to re -roof one of the buildings. An estimate from the vendor put that cost at <br />between $7k and $10k. City Hall's roof was replaced after the recent hail storm. The fire station's roof (a flat <br />roof) is original to the building (circa 1991). A rough estimate to re -roof the fire station is around $40k to $50k. <br />The existing roof does not have any notable issues other than its age. The city's capital equipment replacement <br />fund plan has $35,000 programmed for 2028 to replace the fire station roof. <br />all <br />COST AND SOURCE(S) OF FUNDING: <br />$40,000 - $50,000 (initial estimates); Capital Equipment Replacement Fund <br />REQUESTED COUNCIL ACTION: <br />Discuss whether to replace the fire station roof prior to placement of solar panels. <br />No formal action is required at this time. <br />For Clerk's Use: <br />SUPPORTED DOCUMENTS ATTACHED <br />Motion By: <br />Resolution Ordinance Contract Minutes Plan Map <br />Second By: <br />Vote Record: Ave Na <br />0 Love <br />F--j Koski <br />Taylor <br />other (specify) Informal report from Public Works Director <br />_ F--] Sweeney <br />Mosher <br />Administration Department Use: <br />Consent <br />Refer to: <br />Regular <br />I IL <br />Tabled Until: <br />1= Other: <br />
The URL can be used to link to this page
Your browser does not support the video tag.