Laserfiche WebLink
rd <br />Old Mill Estates 3 Addition <br />rd <br />The developer of Old Mill Estates is proposing a 3 Addition concept that went before the Planning & <br />th <br />Zoning Commission for a ÐConcept ReviewÑ at their March 4, meeting. This subdivision was always a <br />stnd <br />part of the discussion when Old Mill Estates (1 and 2 Additions) was platted. However, the developer <br />needed more time to work out wetland and power line easement issues. With some of those issues more in <br />hand, the proposed subdivision would break up Lot 8, Block 2, into 4 lots (3 new lots). <br /> <br />Block 7 Property (Downtown) <br />The prospective developer again met with city staff the week of October 28 and presented some renderings <br />of potential townhomes. Staff discussed architectural requirements, CDBG grant restrictions and other <br />logistical issues with the site. We expect to see a revised set of renderings and site plans in the coming <br />weeks, with the possibility of a full proposal for consideration by the Planning Commission in December. <br /> <br />1737 Main Street (Block 3) <br />Staff received a call from a business owner asking about using Block 3 as a place for a semi-permanent food <br />truck. We have set a meeting with them to discuss possible arrangements for something of this nature. <br /> <br />Max Storage <br />The developers of Max Storage have decided wait until spring to begin construction of Phase II. <br /> <br />2062 Fairview Street Î Design House Greetings <br />Design House Greetings is considering a second building to expand their current operation in Centerville. <br />A concept plan was reviewed at the Planning and Zoning Commission meeting on September 3. A formal <br />Site Plan Review application is anticipated in the coming weeks. <br /> <br />Kwik Trip <br />The city council approved a reduction in the developmentÓs security, with the final escrow release coming <br />at the end of the 2-year warranty period (Dec. Ó24) <br /> <br />Bay View Villas (Waterworks Site) <br />At the last City Council meeting, final payment of outstanding claims was authorized. A final accounting <br />of the escrow account is being completed and a refund of any remaining funds will be sent in the coming <br />weeks. <br /> <br />Development Inquiries <br /> Potential franchisee looking at existing building in B-1 Commercial Zone for Commercial <br />Recreation space. <br /> Trade business looking at existing building in B-1 Commercial Zone for office, storage, light <br />assembly. <br /> Developer looking at putting up 3 to 4 story building on Main Street. <br /> Developer looking at redevelopment of Block 5 (KellyÓs Block) <br /> <br />COMMUNITY ENGAGEMENT (October 2024) <br />Website <br /> 2.0k users <br /> 1.9k new <br /> 7.0k page views <br /> <br />Website (Featured News) <br /> Stay Connected <br /> Follow us on social media <br /> Volunteer Needed <br /> <br />