Laserfiche WebLink
History <br />Infrastructure Investments <br />City invests in trail connections, <br />streetscaping and Cornerstone Park as <br />part of CSAH 14 (Main Street) <br />reconstruction. Total cost of $1.4 M, with <br />2009 <br />$750k in Federal Transportation <br />Enhancement Grant. Remnant parcels on <br />north side of Main Street deeded to city. <br />2011-City invests in stormwater re-use <br />project, eliminating the need for stormwater <br />2011- <br />treatment ponds in the downtown, south of <br />Main Street. City cost $200k + $250k Grant <br />2015 <br />2015 –City invests in 42” stormwater trunk <br />main to serve the downtown. City cost $450k <br />Downtown Street and Utility project <br />completed. Infrastructure sized to <br />accommodate redevelopment. <br />2020 <br />Irrigation System Expanded. City cost $100k + <br />$100k grant <br /> <br />