My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-01-11 CC WS Packet - (Intros. & Gov. Basics)
Centerville
>
City Council
>
Agenda Packets
>
2025
>
2025-01-11 CC WS Packet - (Intros. & Gov. Basics)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 11:56:01 AM
Creation date
1/9/2025 11:55:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
History <br />Infrastructure Investments <br />City invests in trail connections, <br />streetscaping and Cornerstone Park as <br />part of CSAH 14 (Main Street) <br />reconstruction. Total cost of $1.4 M, with <br />2009 <br />$750k in Federal Transportation <br />Enhancement Grant. Remnant parcels on <br />north side of Main Street deeded to city. <br />2011-City invests in stormwater re-use <br />project, eliminating the need for stormwater <br />2011- <br />treatment ponds in the downtown, south of <br />Main Street. City cost $200k + $250k Grant <br />2015 <br />2015 –City invests in 42” stormwater trunk <br />main to serve the downtown. City cost $450k <br />Downtown Street and Utility project <br />completed. Infrastructure sized to <br />accommodate redevelopment. <br />2020 <br />Irrigation System Expanded. City cost $100k + <br />$100k grant <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.