Laserfiche WebLink
Project Banjo -Existing Noise Assessment <br />November 27, 2024-Page6 <br />Conclusions <br />TheProject Banjosite is generally located north of Fairview Street, south of Commerce Drive, east of <br />thst <br />20Avenue S, and west of 21Avenue S. The site is mainly surrounded by a mix or residential and <br />commercial land uses to the north, south, and west as well as undeveloped land to the east. <br />After measuring existing noise levels nearthe residential land uses west of the Project Banjo site, it <br />was determined that the existing noise environment generally consists of noise generated from traffic <br />th <br />along 20Avenue S, Main Street, and I-35E, activities from nearby residential and commercial land <br />uses, and environmental sources (i.e., wind in trees, birds, insects, etc.).The existing noise levels <br />measured near the residential land uses west of the Project Banjo site averaged approximately <br />52dB(A) and 56dB(A) throughout the entire day. <br />Itwas observed that noise associated with trucks and employee vehicles intermittently accessing the <br />Project Banjo site throughout the daytime and nighttime hours didnot cause noticeable increases in <br />existing noise levels and areconsistent with the average daytime and nighttime noise levels <br />th <br />previously monitored in the field near the residences west of 20AvenueS. At this time,compliance <br />with the established noise goals for the developmentis achieved. <br />kimley-horn.com <br />98 <br /> <br />