Laserfiche WebLink
OPINION OF PROBABLE COST <br />THIN OVERLAY IMPROVEMENTS <br />CENTERVILLE, MN <br />February, 2025 <br />ITEM UNIT CITY UNIT PRICE COST <br />MOBILIZATION <br />TRAFFIC CONTROL <br />MILL BITUMINOUS SURFACE (1") <br />REMOVE AND REPLACE CURB AND GUTTER <br />BITUMINOUS PATCHING MIXTURE <br />ADJUST VALVE BOX <br />ADJUST CASTING (IN STREET) <br />ADJUST CASTING (CURB INLET) <br />REPAIR STRUCTURE <br />BITUMINOUS MATERIAL FOR TACK COAT <br />BITUMINOUS ASPHALT MATERIAL (Wear - 1") <br />BITUMINOUS PAVEMENT PATCHING <br />DRIVEWAY REPLACEMENT <br />STRIPING <br />LANDSCAPING ALLOWANCE <br />RESTORATION <br />LS <br />1 <br />$28,500.00 <br />$28,500.00 <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />SY <br />29,000 <br />$2.00 <br />$58,000.00 <br />LF <br />1900 <br />$50.00 <br />$95,000.00 <br />TN <br />70 <br />$190.00 <br />$13,300.00 <br />EA <br />15 <br />$600.00 <br />$9,000.00 <br />EA <br />40 <br />$800.00 <br />$32,000.00 <br />EA <br />37 <br />$700.00 <br />$25,900.00 <br />LS <br />1 <br />$28,000.00 <br />$28,000.00 <br />GAL <br />1500 <br />$4.00 <br />$6,000.00 <br />TON <br />2450 <br />$100.00 <br />$245,000.00 <br />LS <br />1 <br />$36,000.00 <br />$36,000.00 <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />LS <br />1 <br />$2,400.00 <br />$2,400.00 <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />SUBTOTAL <br />$624,100.00 <br />15%CONSTRUCTION <br />CONTINGENCY <br />$93,615.00 <br />SUBTOTAL CONSTRUCTION COSTS $717,715.00 <br />10% INDIRECT COSTS $71,771.50 <br />TOTAL ESTIMATED PROJECT COSTS $789,486.50 <br />