Laserfiche WebLink
UNITESTIMATED <br />NO.ITEMUNITESTIMATED COST <br />PRICEQUANTITY <br />ALTERNATE NO. 1: OLD MILL ROAD <br />INLET PROTECTIONEA <br />1$41,400.00350.00$ <br />REMOVE AND REPLACE CONCRETE CURB & GUTTERLF <br />2$50.00135$6,750.00 <br />REMOVE BITUMINOUS PAVEMENT (PATCHING)SY <br />3$10.0050$500.00 <br />REMOVE CONCRETE DRIVEWAY PAVEMENTSF <br />4$4.00100$400.00 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENTSF <br />5$3.00100$300.00 <br />MILL BITUMINOUS PAVEMENT (1")SY <br />6$2.001,850$3,700.00 <br />MILL BITUMINOUS CONSTRUCTION JOINTLF <br />7$10.0065$650.00 <br />SUBGRADE EXCAVATION (EV)CY <br />8$30.0050$1,500.00 <br />AGGREGATE BASE, CLASS 5TN <br />9$35.0030$1,050.00 <br />RECONSTRUCT INVERT/DOGHOUSEEA <br />10$1,600.001$1,600.00 <br />ADJUST VALVE BOXEA <br />11$700.001$700.00 <br />REMOVE AND REPLACE MANHOLE ADJUSTING RINGSEA <br />12$800.003$2,400.00 <br />REMOVE AND REPLACE CATCH BASIN ADJUSTING RINGSEA <br />13$800.003$2,400.00 <br />BITUMINOUS MATERIAL FOR TACK COATGAL <br />14$4.0095$380.00 <br />BITUMINOUS OVERLAY WEAR COURSE (SPWEA340B)TN <br />15$100.00150$15,000.00 <br />BITUMINOUS NON-WEAR COURSE MIXTURE FOR PATCHING (SPNWA330B)TN <br />16$200.0010$2,000.00 <br />BITUMINOUS WEAR COURSE MIXTURE FOR DRIVEWAYS (SPWEA340B)TN <br />17$200.005$1,000.00 <br />6-INCHES THICK CONCRETE DRIVEWAYSF <br />18$20.00100$2,000.00 <br />RESTORATION (TOPSOIL, SEED WITH HYDROMULCH)SY <br />19$10.0075$750.00 <br />STREET SWEEPER WITH PICKUP BROOM AND OPERATORHR <br />20$180.005$900.00 <br />SUBTOTAL - ALTERNATE NO. 1 <br />$45,380.00 <br />CONSTRUCTION CONTINGENCY (5%)$2,269.00 <br />SUBTOTAL - CONSTRUCTION$47,649.00 <br />INDIRECT COSTS (10%)$4,764.90 <br />ALTERNATE NO. 1 - TOTAL ESTIMATED PROJECT COST$52,413.90 <br />UNITESTIMATED <br />NO.ITEMUNITESTIMATED COST <br />PRICEQUANTITY <br />ALTERNATE NO. 2: BRIAN DRIVE <br />INLET PROTECTIONEA <br />1$350.002$700.00 <br />REMOVE AND REPLACE CONCRETE CURB & GUTTERLF <br />2$50.00155$7,750.00 <br />REMOVE BITUMINOUS PAVEMENT (PATCHING)SY <br />3$10.0045$450.00 <br />REMOVE CONCRETE DRIVEWAY PAVEMENTSF <br />4$4.00100$400.00 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENTSF <br />5$3.00100$300.00 <br />MILL BITUMINOUS PAVEMENT (1")SY <br />6$2.001900$3,800.00 <br />MILL BITUMINOUS CONSTRUCTION JOINTLF <br />7$10.0060$600.00 <br />SUBGRADE EXCAVATION (EV)CY <br />8$30.0050$1,500.00 <br />AGGREGATE BASE, CLASS 5TN <br />9$35.0030$1,050.00 <br />RECONSTRUCT INVERT/DOGHOUSEEA <br />10$1,600.001$1,600.00 <br />REMOVE AND REPLACE MANHOLE ADJUSTING RINGSEA <br />11$800.002$1,600.00 <br />REMOVE AND REPLACE CATCH BASIN ADJUSTING RINGSEA <br />12$800.002$1,600.00 <br />BITUMINOUS MATERIAL FOR TACK COATGAL <br />13$4.00100$400.00 <br />BITUMINOUS OVERLAY WEAR COURSE (SPWEA340B)TN <br />14$100.00150$15,000.00 <br />BITUMINOUS NON-WEAR COURSE MIXTURE FOR PATCHING (SPNWA330B)TN <br />15$200.0015$3,000.00 <br />BITUMINOUS WEAR COURSE MIXTURE FOR DRIVEWAYS (SPWEA340B)TN <br />16$200.005$1,000.00 <br />6-INCHES THICK CONCRETE DRIVEWAYSF <br />17$20.00100$2,000.00 <br />RESTORATION (TOPSOIL, SEED WITH HYDROMULCH)SY <br />18$10.0090$900.00 <br />STREET SWEEPER WITH PICKUP BROOM AND OPERATORHR <br />19$180.005$900.00 <br />SUBTOTAL - ALTERNATE NO. 2 <br />$44,550.00 <br />CONSTRUCTION CONTINGENCY (5%)$2,227.50 <br />SUBTOTAL - CONSTRUCTION$46,777.50 <br />INDIRECT COSTS (10%)$4,677.75 <br />ALTERNATE NO. 2 - TOTAL ESTIMATED PROJECT COST$51,455.25 <br />SUMMARY OF ESTIMATED COSTS <br />BASE BID$671,517.00 <br />ALTERNATE NO. 1: OLD MILL ROAD$52,413.90 <br />ALTERNATE NO. 2: BRIAN DRIVE$51,455.25 <br />TOTAL ESTIMATED PROJECT COSTS$775,386.15 <br />47 <br /> <br />