Laserfiche WebLink
6 Minimum Control Measures <br />Basic Components of the MS4 Permit <br />Municipal Operations <br />1.Public Education and Outreach2.Public Participation and Involvement3.Illicit Discharge Detection and Elimination4.Construction Site Storm Water Runoff Control5.Post-Construction Storm <br /> Water Management6.Pollution Prevention and Good Housekeeping for <br /> <br />