,2025 <br />Page2 of 4 <br />Reference: Proposal for Well 1 Rehabilitation <br />B.Repair of well pump and motorif it is determined to be feasible or replace the pump with a new <br />pump and motor sized for the re-developed capacity. Determine pump replacement cost with high <br />efficiency pump.A line item on bid formwill be includedto account for this. <br />C.Determine work to be done on well. <br />a.Sand removal. A line item on bid formwill be included to account for this. Sand removal to <br />be billed by Contractor based on quantity of sand removed. <br />b.Televisewell. A downhole video camera will assess the current condition of the well. <br />D.Contractor to take bacteria sample before well goes back in service. <br />Task 2: Construction and Start Up Services. <br />Stantec will provide support during construction and startup of Well 1 following the rehabilitation. Work to be <br />included in this task is listed belowto restore this well to emergency operation as soon as possible. The <br />existing pump will be repaired and re-installed as soon as possible. <br />1.Stantec willas the CityÓs representative for all communications, reviews and approvals with the <br />Contractor. <br />2.Review modifications reasonably within the scope of a well rehabilitation project. <br />3.Inspect dismantled well pumpand column at ContractorÓs shop and prepare recommendations on <br />repair or replacement. <br />4.After motor is inspected at the motor repair shop make recommendation for repair or replacement. <br />5.Observation of work done at the facilities. <br />a.Televising. <br />b.Sand removal. <br />c.Start up. <br />6.Review shop drawings. <br />7.Prepare payment requests. <br />8.Prepare any required change orders. <br />9.Review operation and maintenance manuals. <br />10.Observe pump performance test at start up at site. <br />11.Furnish updated information and record plans. <br />NEXT STEPS: <br />After the new well capacity is determined, the city will be consulted as to returning this well from an <br />emergency-use designation to a primary water supply well designation. Building renovations, replacements, <br />or a complete re-construction canbe discussed after the well has been re-developed.Building options are <br />not included in this re-development scope. <br />42 <br /> <br />