Laserfiche WebLink
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS - WELL NO. 1 MAINTENANCE PROJECT <br />Ftujnbufe!VojuFtujnbufe <br />Op/JufnVojutRuzQsjdfUpubm!Qsjdf <br />1MOBILIZATION, DEMOBILIZATION, PROTECTION OF WELL SITE, CLEANUP, INSURANCE, AND ALLLS1$25,000.00$25,000.00 <br />COSTS NOT SCHEDULED BELOW <br />2REMOVE AND REINSTALL SUBMERSIBLE TURBINE PUMP AND MOTORLS1$20,000.00$20,000.00 <br />3WIRE BRUSH INTERIOR SURFACE OF WELL CASINGHR12$350.00$4,200.00 <br />46" X 20' SCH. 40, THREADED DROP PIPE WITH COUPLINGEA5$1,500.00$7,500.00 <br />56" X 10' SCH. 40, THREADED DROP PIPE WITH COUPLINGEA1$1,200.00$1,200.00 <br />6FURNISH S.S. BOWL SHAFTLS1$1,000.00$1,000.00 <br />7DISASSEMBLE AND REASSEMBLE BOWL ASSEMBLYLS1$1,500.00$1,500.00 <br />8FURNISH AND INSTALL COMPLETE SET OF BOWL BEARINGSLS1$900.00$900.00 <br />9MACHINE BOWL AND IMPELLER AND INSTALL BRONZE WEAR RING PER STAGEEA3$750.00$2,250.00 <br />10FURNISH AND INSTALL NEW CHECK VALVE(S) IN DROP PIPE, IF DIRECTEDLS1$4,000.00$4,000.00 <br />11SHOP TIME FOR WELL PUMP REPAIRSHR30$125.00$3,750.00 <br />12CONTINGENCY ALLOWANCE FOR MOTOR AND MISCELLANEOUS REPAIRSLS1$12,000.00$12,000.00 <br />13PAINT DROP PIPE AND BOWL ASSEMBLY AS SPECIFIEDLS1$7,500.00$7,500.00 <br />14INSTALL/REPLACE EXISTING WATER LEVEL MONITORING TUBESLF105$3.00$315.00 <br />15MOBILIZATION OF RIG FOR BAILING OF WELL, IF DIRECTEDLS1$9,000.00$9,000.00 <br />16BAILING OF LOOSE SANDSTONE FROM BOTTOM OF WELLCY20$300.00$6,000.00 <br />17TELEVISION INSPECTION OF WELL NO. 1EA1$3,000.00$3,000.00 <br />ESTIMATED TOTAL BASE QUOTATION <br />$109,115.00 <br />ALTERNATE UNIT PRICES - WELL NO. 1 <br />18MOBILIZATION, DEMOBILIZATION, AND OPERATION OF A RIG FOR REDEVELOPMENT OF WELLEA1$15,000.00$15,000.00 <br />19WELL REDEVELOPMENT USING DECOMPRESSION AND AIRLIFTINGHR40$350.00$14,000.00 <br />20AIR LIFTING OF LOOSENED MATERIAL FROM WELLCY100$250.00$25,000.00 <br />21FURNISH, INSTALL, AND REMOVE TEMPORARY PUMP FOR POST-DEVELOPMENT TESTINGLS1$11,000.00$11,000.00 <br />22POST DEVELOPMENT TEST PUMPINGHR40$250.00$10,000.00 <br />23FURNISH AND INSTALL A NEW BOWL ASSEMBLY OF EQUAL CAPACITY, HEAD, ANDLS1$20,000.00$20,000.00 <br />PERFORMANCE TO EXISTING PUMP BOWLS <br />24FURNISH AND INSTALL NEW POWER CABLE FROM PUMP MOTOR TO EXISTING CONTROL BOXLS1$7,500.00$7,500.00 <br />AND SPLICE KIT, IF DIRECTED <br />25FURNISH AND INSTALL NEW 50 HP MOTOR AS SPECIFIEDLS1$20,000.00$20,000.00 <br />85 <br /> <br />