Laserfiche WebLink
Project Name: <br />Centerville Well No. 1 Maintenance Project <br />I hereby certify that this is an exact <br />reproduction of quotes received. <br />City Project No.: <br />Stantec Proj. No.:173411140 <br />Quote Opening: <br />Wednesday, October 15, 2025 at 12 P.M., CDTOwner:City of Centerville, MN <br />Mark Janovec, P.G. <br />Quote No. 1Quote No. 2Quote No. 3Quote No. 4 <br />QUOTATION TABULATIONTraut CompaniesE.H. Renner and Sons Inc.Bergerson-Caswell Inc.Keys Well Drilling Co. <br />Item <br />ItemUnitsQtyUnit PriceTotal <br />Num <br />Unit PriceTotalUnit PriceTotalUnit PriceTotal <br />WELL PUMP FACILITY NO. 1 REPAIRS: <br />1MOBILIZATION, DEMOBILIZATION, PROTECTION OF WELL SITE, CLEANUP, INSURANCE, LS1$8,700.00$8,700.00$6,000.00$6,000.00$15,587.00$15,587.00$7,000.00$7,000.00 <br />AND ALL COSTS NOT SCHEDULED BELOW <br />2REMOVE AND REINSTALL SUBMERSIBLE TURBINE PUMP AND MOTORLS1$6,500.00$6,500.00$4,800.00$4,800.00$8,852.00$8,852.00$5,000.00$5,000.00 <br />3WIRE BRUSH INTERIOR SURFACE OF WELL CASINGHR12$425.00$5,100.00$500.00$6,000.00$391.00$4,692.00$360.00$4,320.00 <br />46" X 20' SCH. 40, THREADED DROP PIPE WITH COUPLINGEA5$775.00$3,875.00$700.00$3,500.00$531.00$2,655.00$1,200.00$6,000.00 <br />56" X 10' SCH. 40, THREADED DROP PIPE WITH COUPLINGEA1$400.00$400.00$350.00$350.00$345.00$345.00$550.00$550.00 <br />6DISASSEMBLE AND REASSEMBLE BOWL ASSEMBLYLS1$500.00$500.00$800.00$800.00$1,259.00$1,259.00$1,200.00$1,200.00 <br />7FURNISH AND INSTALL COMPLETE SET OF BOWL BEARINGSLS1$500.00$500.00$1,800.00$1,800.00$956.00$956.00$1,000.00$1,000.00 <br />8FURNISH AND INSTALL NEW CHECK VALVE(S) IN DROP PIPE, IF DIRECTEDLS1$2,100.00$2,100.00$1,150.00$1,150.00$10,166.00$10,166.00$1,000.00$1,000.00 <br />9SHOP TIME FOR WELL PUMP REPAIRSHR30$125.00$3,750.00$125.00$3,750.00$158.00$4,740.00$120.00$3,600.00 <br />10CONTINGENCY ALLOWANCE FOR MOTOR AND MISCELLANEOUS REPAIRSLS1$12,000.00$12,000.00$12,000.00$12,000.00$12,000.00$12,000.00$12,000.00$12,000.00 <br />11PAINT DROP PIPE AND BOWL ASSEMBLY AS SPECIFIEDLS1$2,200.00$2,200.00$3,200.00$3,200.00$3,446.00$3,446.00$700.00$700.00 <br />12INSTALL/REPLACE EXISTING WATER LEVEL MONITORING TUBESLF105$3.00$315.00$7.00$735.00$6.00$630.00$2.00$210.00 <br />13MOBILZATION OF RIG FOR BAILING OF WELL, IF DIRECTEDLS1$5,000.00$5,000.00$15,000.00$15,000.00$2,193.00$2,193.00$15,000.00$15,000.00 <br />14BAILING OF LOOSE SANDSTONE FROM BOTTOM OF WELLCY20$275.00$5,500.00$500.00$10,000.00$489.00$9,780.00$600.00$12,000.00 <br />15TELEVISION INSPECTION OF WELL NO. 1EA1$2,100.00$2,100.00$1,950.00$1,950.00$2,500.00$2,500.00$2,200.00$2,200.00 <br />TOTAL WELL NO. 1 QUOTATION$58,540.00$71,035.00$79,801.00$71,780.00 <br />ADDITIONAL UNIT PRICES WELL NO. 1: <br />16MOBILIZATION, DEMOBILIZATION, AND OPERATION OF A RIG FOR REDEVELOPMENT OF EA1$8,900.00$8,900.00$15,000.00$15,000.00$2,714.00$2,714.00$70,000.00$70,000.00 <br />WELL <br />17WELL REDEVELOPMENT USING DECOMPRESSION AND AIRLIFTINGHR40$450.00$18,000.00$500.00$20,000.00$391.00$15,640.00$575.00$23,000.00 <br />18AIR LIFTING OF LOOSENED MATERIAL FROM WELLCY100$275.00$27,500.00$250.00$25,000.00$489.00$48,900.00$650.00$65,000.00 <br />19FURNISH, INSTALL, AND REMOVE TEMPORARY PUMP FOR POST-DEVELOPMENT TESTINGLS1$7,500.00$7,500.00$4,800.00$4,800.00$4,474.00$4,474.00$23,000.00$23,000.00 <br />20POST DEVELOPMENT TEST PUMPINGHR40$295.00$11,800.00$500.00$20,000.00$391.00$15,640.00$350.00$14,000.00 <br />21FURNISH AND INSTALL A NEW BOWL ASSEMBLY OF EQUAL CAPACITY, HEAD, AND LS1$5,800.00$5,800.00$6,852.00$6,852.00$5,821.00$5,821.00$5,500.00$5,500.00 <br />PERFORMANCE TO EXISTING PUMP BOWLS <br />22FURNISH AND INSTALL NEW POWER CABLE FROM PUMP MOTOR TO EXISTING CONTROL LS1$1,400.00$1,400.00$1,800.00$1,800.00$1,095.00$1,095.00$1,200.00$1,200.00 <br />BOX AND SPLICE KIT, IF DIRECTED <br />23FURNISH AND INSTALL NEW 50 HP MOTOR AS SPECIFIEDLS1$5,400.00$5,400.00$5,500.00$5,500.00$5,441.00$5,441.00$4,900.00$4,900.00 <br />TOTAL WELL NO. 1 ADDITIONAL UNITS$86,300.00$98,952.00$99,725.00$206,600.00 <br />WELL NO. 1: NEW PUMP BOWL MANUFACTURED BY:GRUNDFOSGRUNDFOSAY MCDONALDGRUNDFOS <br />WELL NO. 1: NEW PUMP MODEL AND STAGES:625S500-3AA STAGE625S500-3AA STAGE650S50 HP106625S500-3 3-STAGES <br />WELL NO. 1: PUMP EFFICIENCY IS:80.0%72.7%79.0%73.0% <br />WELL NO. 1: NEW MOTOR MANUFACTURER IS:SMESME 6-INCH ECHO SERIESFRANKLINSME <br />MOTOR HORSEPOWER AND EFFICIENCY AT FULL LOAD IS:50HP 81%50 HP, 87.3%50 HP, 82%50 HP, 86.1% <br />Contractor Name and Address: <br />Traut CompaniesE.H. Renner & Sons, Inc.Bergerson Caswell, Inc.Keys Well Drilling Company <br />32640 County Road 13315688 Jarvis St. NW5115 Industrial Street1156 Homer Street <br />St. Joseph, MN 56374Elk River, MN 55330Maple Plain, MN 55359St. Paul, MN 55116-3232 <br />320-251-5090763-427-6100952-255-7003651-646-7871 <br />Phone: <br />joet@trautcompanies.comkrenner@ehrenner.comjason@bergersoncaswell.comtrevorkeys@keyswell.com <br />Email: <br />Jamie HamstromKathrynn R. WelleJason PopkoTrevor Keys <br />Signed By: <br />Vice PresidentPresidentProject ManagerVice President <br />Title: <br />173411140-Quote Tab Well 1.xlsm <br />58 <br /> <br />