My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-12-11 WS & CC Packet
Centerville
>
City Council
>
Agenda Packets
>
2025
>
2025-12-11 WS & CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2025 9:48:35 AM
Creation date
12/8/2025 9:47:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nfnp <br />To:Athanasia LewisFrom:Kellie Schlegel <br />City of CentervilleStantec <br />Project/File:193807350Date:December 4, 2025 <br />Reference: Centerville and Lino Lakes Water Supply Interconnects <br />Background: <br />The City of Centerville and the City of Lino Lakes have two interconnections between their respective water <br />distribution systems. These interconnections serve as an emergency back-up to each community’s water <br />supply. An Interconnect Agreement, dated January 9, 2019, stipulates ownership, maintenance, and other <br />standards and requirements of the two interconnections. <br />In 2023, approximately 25 million gallons (MG) of water flowed from Lino Lakes to Centerville through one <br />of these interconnections. Per the agreement, there are two mechanisms for repayment of the water: <br />Centerville may provide Lino Lakes with an equivalent amount of water; or, if Centerville does not have the <br />capacity to do this, they may reimburse Lino Lakes monetarily in an amount equal to 80% of Lino’s <br />residential water rate for the amount of water received. <br />Reimbursement via Water: <br />The City of Lino Lakes prepared a technical memorandum (attached to this memo), that outlines several <br />concerns and constraints regarding Centerville’s ability to provide them with water. The memo discussed <br />two scenarios: providing water to the entirety of Lino Lakes, and providing water only to the Watermark <br />Development within Lino lakes. We have reviewed that memo and offer the following comments. <br />Capacity within Centerville’s Water System: The City of Centerville does not have the capacity within its <br />system to supply the entire City of Lino Lakes with water. However, the City of Centerville does have <br />additional capacity within its system to supply water to the Watermark development, but only during non- <br />peak months (i.e. during the winter). Repayment of the required volume of water would take approximately <br />6 months, meaning it would need to start almost immediately in order to repay the water prior to the peak <br />summer watering period. Lino Lakes also indicated that all repayment must be completed by the fall of <br />2026 so as not to interfere with the startup of their new Water Treatment Plant. <br />Water Quality: Centerville’s Manganese levels currently fall below the 0.1 mg/L threshold, and the water <br />supply falls within acceptable ranges for other contaminants. <br />Fire Flows: Lino Lakes’ model predicts that the available fire flows would decrease if served by Centerville. <br />Hydrant flow tests, static pressure readings, along with a water system model could be used to confirm <br />actual fire flows. The City will need to coordinate with the Lino Lakes Fire Department to determine what <br />22 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.