My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026 Neighboring City Research
Centerville
>
Ordinances
>
Uncoded Ordinances
>
Research for 2026 Fees
>
2026 Neighboring City Research
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 9:25:29 AM
Creation date
12/9/2025 9:25:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
including $2,000 <br /> $82 for the first $2,000 plus $14.85 for each <br /> Valuation $2,001 to $25,000 additional $1,000 or fraction thereof, to and <br /> including $25,000 <br /> $423.55 for the first $25,000 plus $10.70 for <br /> Valuation $25,001 to $50,000 each additional $1,000 or fraction thereof, to and <br /> including $50,000 <br /> $691.05 for the first $50,000 plus $7.45 for each <br /> Valuation $50,001 to $100,000 additional $1,000 or fraction thereof, to and <br /> including $100,000 <br /> $1,063.55 for the first $100,000 plus $6 for each <br /> Valuation $100,001 to $500,000 additional $1,000 or fraction thereof, to and <br /> including $500,000 <br /> $3,463.55 for the first $500,000 plus $5.10 for <br /> Valuation $500,000 to $1,000,000 each additional $1,000 or fraction thereof, to and <br /> including $1,000,000 <br /> Valuation $1,000,001 and up $6,013.55 for the first $1,000,000 plus $4 for <br /> each additional $1,000 or fraction thereof <br /> Reinspection fee (in addition to all other fees) $50 <br /> Investigation fee (working without permit) Double fee <br /> RESIDENTIAL ELECTRICAL PERMIT FEES (SINGLE FAMILY HOMES, APARTMENTS, AND <br /> CONDOMINIUMS) <br /> HOMEOWNERS AND CONTRACTORS: Complete an electrical permit form available from the <br /> Building Inspections Division. Add $1 for state surcharge to total cost of each permit. The fee is the <br /> total of the listed fees or the total number of inspection trips x $50, whichever is greater. <br /> Residential panel replacement $110 <br /> Sub panel $50 <br /> New service or power supply (circuits) Add $16 for each additional 100 amps <br /> 0 to 300 amp $55 <br /> 400 amp $71 <br /> New service or power supply (feeders) Add $6 for each additional 100 amps <br /> O to 100 amp $9 <br /> 101-200 amp $15 <br /> Minimum permit fee is $50 plus $1 state surcharge. This is for one inspection only. Minimum fee for <br /> rough-in and final inspection is $100 plus $1 state surcharge. <br /> Maximum fee for single-family dwelling or townhouse not over 200 amps (no max if service is over <br /> 200 amps) is $200 plus $1 state surcharge. Maximum of 2 rough-ins and 1 final inspection. (Failed <br /> inspections are an additional $50 each) <br /> Apartment or condominium complex (does not <br /> cover service, unit feeders or house panels) $90 per unit <br /> Swimming pool and hot tub $100 plus circuits at $9/each (includes 2 <br /> inspections) <br /> Addition/remodel/basement finish $100 (includes up to 10 circuits and 2 <br /> inspections) <br />
The URL can be used to link to this page
Your browser does not support the video tag.