Laserfiche WebLink
Residential accessory structure The greater of $55 for panel plus $9 per circuit <br /> or $100 for 2 inspections <br /> Street and parking lot lights $5 per each standard <br /> Transformers and generators: <br /> Up to 10 kva $5 <br /> 11 to 74 kva $45 <br /> 75 kva to 299 kva $60 <br /> Over 299 kva $165 <br /> Retrofit lighting $0.85 per fixture <br /> Sign transformer or driver $9 per transformer <br /> Low voltage fire alarm, low voltage heating and <br /> air conditioning control wiring $0.85 per device <br /> Residing jobs $50 first unit, $35 for each additional unit <br /> Reinspection fee (in addition to all other fees) $50 <br /> Solar Fees: <br /> 0 kw to 5 kw $90 <br /> 5.1 kw to 10 kw $150 <br /> 10.1 kw to 20 kw $225 <br /> 20.1 kw to 30 kw $300 <br /> 30.1 kw to 40 kw $375 <br /> 40.01 kw and larger $375 plus $25 for each additional 10 kw <br /> Electrical inspection fee: furnace, air <br /> conditioning, bath fan, fireplace or receptacle for $40 <br /> water heater vent <br /> Refunds must be requesting in writing. No refunds unless more than the minimum fee. Refunds are <br /> minus the city's 20% handling fee. <br /> Permit fee is doubled if the work starts before the permit is issued. <br /> Minimum fee permits expire in 6 months. <br /> Permits over the minimum fee and up to $250 expire in 1 year. <br /> Fire inspections (DHS) $50 <br /> Fire panel systems See M.S. § 326B.153 <br /> Fire permit (no surcharge), all permits unless $100 <br /> noted otherwise <br /> Fireworks display/fireworks sales $100 <br /> Fireworks sales only (businesses) $350 <br /> Fireworks sales with other retail (businesses) $100 <br /> Fire permit, temporary tent $50 <br /> Fire permit, tank installation (fuel, oil, gas, and $100 per tank <br /> the like) <br /> Fire permit, tank removal $50 per tank <br /> Fire permit, operational $50 per year <br /> Fire permit, chemical fire suppression $100 <br />