My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026 Neighboring City Research
Centerville
>
Ordinances
>
Uncoded Ordinances
>
Research for 2026 Fees
>
2026 Neighboring City Research
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 9:25:29 AM
Creation date
12/9/2025 9:25:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. OTHER INSPECTION/PLANNING FEES <br /> Applicants are responsible for all costs incurred associated with the filing, review and processing of <br /> development applications. Such fees to be paid in escrow up front or upon receipt of statement from <br /> the City of Mounds View. Fees may include, but are not limited to, costs for consultants retained by the <br /> city, consultant planning services, attorney, and engineer fees.A deposit may also be required to cover <br /> costs of public notices, materials and staff time spent in the review, research or preparation of <br /> materials associated with each application. The applicant shall be responsible for all reasonable <br /> incurred costs in excess of the initial fee and/or deposit amount. Any portion of the deposit not spent or <br /> encumbered shall be refunded to the applicant within 30 days after consideration of the application is <br /> completed. Payment of any park dedication fees shall be made by the applicant after final plat <br /> approval. Application fees are not refundable. <br /> II. OTHER INSPECTION/PLANNING FEES <br /> Type Fee <br /> II. OTHER INSPECTION/PLANNING FEES <br /> Type Fee <br /> Building inspections conducted outside normal $63.25/hour (two-hour minimum charge) <br /> business hours <br /> Change of address $150 <br /> Change of occupancy $75 <br /> Comprehensive plan amendment $500 <br /> Conditional use permit, R-1 or R-2 $400 <br /> Conditional use permit, all other districts $400 <br /> Conditional use permit amendment Same as CUP fee <br /> Contractor license (§ 150.053) $60 <br /> Contractor state license verification fee $5 per permit <br /> Development/site plan review $400 <br /> Escrow - manufactured homes $500 per permit <br /> Escrow - occupancy (seed, sod, landscaping; <br /> as-building grading survey; driveway installation; <br /> curb cut modifications; site clean-up; storm <br /> water management; drainage features; site $1,000 for each item <br /> erosion; right-of-way restoration; or any other <br /> items as determined by the Building Official) <br /> Escrow, planning (actual charges) $2,500 - $10,000 <br /> Housing inspection initial and one follow-up No charge (Chapter 119) <br /> (includes no shows) <br /> Housing inspection/no show, each additional $100 <br /> Interim use permit (IUP) $400 <br /> IUP amendment $400 <br /> Park dedication fees Residential: $3,500 per unit <br />
The URL can be used to link to this page
Your browser does not support the video tag.