My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026 Neighboring City Research
Centerville
>
Ordinances
>
Uncoded Ordinances
>
Research for 2026 Fees
>
2026 Neighboring City Research
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 9:25:29 AM
Creation date
12/9/2025 9:25:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VII. PUBLIC WORKS RELATED FEES <br /> VII. PUBLIC WORKS RELATED FEES <br /> Type Fee <br /> VII. PUBLIC WORKS RELATED FEES <br /> Type Fee <br /> Call-Out Rate Schedule Based on Current Wages <br /> Normal business hours for call-out rates 7:00 am to 3:30 pm, Monday through Friday <br /> After hours call-out rate, specified time <br /> conducted outside normal business hours $100/hr. (minimum 2 hours) <br /> Holiday call-out rate, specified time conducted <br /> on holidays $150/hr. (minimum 2 hours) <br /> Right-Of-Way Management Fees (Chapter 54). Additional fees may be required for legal and <br /> engineering costs incurred by the city). All issued right-of-way permits will include a $200 <br /> administrative fee. <br /> Excavation, hole fees, boulevard areas $100 per hole <br /> Excavation, hole fees, pavement areas $200 per hole <br /> Excavation, underground utility work, open <br /> trenching - boulevard areas open $50 per 100 lineal feet (requires hole fee) <br /> Excavation, underground utility work, open <br /> trenching - pavement areas $70 per 100 lineal feet (requires hole fee) <br /> Excavation, trenchless installation $35 per 100 lineal feet (requires hole fee) <br /> Excavation, overhead installation $25 per 100 lineal feet <br /> Obstruction, new pavement $100 per obstruction <br /> Obstruction, replace existing obstruction (in- <br /> kind) $50 per obstruction <br /> Temporary obstruction, dumpster, portable <br /> restroom, and the like $25 per obstruction <br /> Temporary obstruction, equipment used for <br /> excavation No charge <br /> Miscellaneous ROW Management Fees and Costs (discount for work done pertaining to city <br /> project; additional fees may be required for legal and engineering costs incurred by the city) <br /> Street opening permit (requires deposit) $200 <br /> Street opening deposit To be determined by the Director of Public <br /> Works <br /> Registration fee (ROW users and registrants) $30 <br /> Permit extension $30 <br /> Delay penalty 10% of ROW permit <br /> Degradation fee Calculated at time of permit <br /> Restoration cost Calculated at time of permit <br /> Overhead utility line repair No charge <br />
The URL can be used to link to this page
Your browser does not support the video tag.