Laserfiche WebLink
Once application review costs (district engineer <br /> and legal counsel) exceed $9,000*, any <br /> additional cost must be reimbursed by the <br /> applicant before the permit can be issued. <br /> $5,400 non-refundable fee due at time of <br /> Residential, commercial, industrial, institutional application. <br /> development that proposes 5 or more acres of Once application review costs (district engineer <br /> new and/or reconstructed impervious surface and legal counsel) exceed $9,000*, any <br /> additional cost must be reimbursed by the <br /> applicant before the permit can be issued. <br /> Notes: An application subject to a Rule C fee is exempt from the non-Rule C fee of $300. <br /> The following is exempt from the Rule C fee and subject to only the non-Rule C fee of $300: single- <br /> family residential subdivision that creates seven or fewer lots and establishes no new public <br /> roadway or a private roadway/driveway serving three or more lots <br /> Non-Rule C fee: A$300 non-refundable fee is due at the time of application for a project subject to <br /> one or more of the following Rules: <br /> Rule D (Erosion and Sediment Control Plans) <br /> Rule E (Floodplain Alteration) <br /> Rule F (Wetland Alteration) <br /> Rule G (Regional Conveyance Systems) <br /> Rule I (Public Drainage Systems) <br /> Rule J (Appropriation of Public Waters) <br /> Rule L (Variances): Variable. See district permit variance guidance <br /> policy <br /> * Review cost is calculated according to the consultant hourly rate, which the District will publish <br /> annually. The review cost incurred between the non-refundable fee amount and $9,000 will be <br /> absorbed by the District and will not be the responsibility of the applicant. District staff will notify the <br /> applicant of the incurred cost to date once the total review cost exceeds $7,500, and at subsequent <br /> $3,000 intervals. A delay in notice, however, will not affect the applicant's reimbursement <br /> responsibility <br /> Surface Water Management (SWM) Utility Fees (Chapter 53) (Cont'd) <br /> Storm water connection/repair/disconnect $100 plus surcharge <br /> Storm water inspection or re-inspection after Call-out rate per visit (minimum 2 hours) <br /> hours. Percolation tests during work hours only. <br /> Street Lighting Utility Fees (§ 152.018) <br /> Residential (single-family homes, duplexes, <br /> fourplexes, condominium and townhomes) $5.25 per unit per quarter <br /> Commercial/industrial $24.58 per acre per quarter <br /> Institutional/charitable $24.58 per acre per quarter <br /> Apartments $24.58 per acre per quarter <br /> Construction Site and Land Disturbance Fees (§ 156.006). Additional fees may be required <br /> for legal and engineering costs incurred by the city. <br /> 50 to 1,000 cubic yards $150 <br /> 1,001 to 10,000 cubic yards $250 base fee plus $35 for each 1,000 cubic <br /> yards <br /> 10,001 to 100,000 cubic yards $500 base fee plus $100 for each 10,000 cubic <br /> yards <br />