My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026 Neighboring City Research
Centerville
>
Ordinances
>
Uncoded Ordinances
>
Research for 2026 Fees
>
2026 Neighboring City Research
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 9:25:29 AM
Creation date
12/9/2025 9:25:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESIDENTIAL ELECTRICAL PERMIT FEES(SINGLE FAMILY HOMES,APARTMENTS, <br /> ASSISTED LIVING, and CONDOMINIUMS) Effective: 1/1/2026 <br /> HOMEOWNERS AND CONTRACTORS:Complete an electrical permit form available from the Building Inspections <br /> Division.Add$1.00 for State surcharge to total cost of each permit.The fee is the total of the listed fees or the total number <br /> of inspection trips x$50.00($60.00),whichever is greater. <br /> Residential panel replacement is $110.00($125.00), sub <br /> panel $50.00 ($75.00). New service or power supply is: Circuits and Feeders <br /> 0 to 300 Amp $55.00($75.00) 0-100 Amp $9.00($12.00) <br /> 400 Amp $71.00($100.00) 101-200Amp $15.00($20.00 <br /> Add$16.00 ($25.00)for each additional 100 Add$6.00 ($10.00)for each additional 100 amps <br /> amps <br /> Maximum Fee: (Dwelling Fees:) <br /> Minimum Fee: Fee for single family dwelling or <br /> Minimum permit fee is$50.00 ($60.00)plus townhouse not over 200 amps (and up to <br /> $1.00 State surcharge.This is for one 25 circuits)(Additional circuits are <br /> inspection only. $12.00/ea) <br /> Minimum fee for rough-in and final inspection is 200Amps) is $200.00 plus(is $225.00 <br /> $100.00 ($120.00)plus$1.00 State surcharge. plus) <br /> $1.00 State surcharge. Maximum of 2 rough-in's and 1 final <br /> Apartment Buildings inspection. (Failed inspections are an additional $50.00 <br /> each)($60.00/each) <br /> Fee per unit of an apartment or condominium complex is$90.00 <br /> ($110.00).This does not cover service, unit feeders or house <br /> panels, (and includes up to 15 circuits per unit) <br /> Swimming Pools and Hot Tubs Additions, $100.00 ($120.00)plus circuits at$9.00/each ($12.00/each).This <br /> includes 2 inspections. <br /> Remodels or Basement Finishes <br /> $100.00 ($120 00)this include up to 10 circuits and 2 inspections <br /> Residential Accessory Structures <br /> The Greater of$55.00($75.00)for panel plus$9.00($12.00)per <br /> circuit or$100($120.00)for 2 inspections. <br /> Street and Parking Lot Lights $5.00($10.00)per each standard <br /> Transformers and Generators $5 up to 10kva,$45($55)11 to 74kva,$60($70)75kva to 299kva, <br /> over 299kva is$165($175) <br /> Retrofit Lighting $0.85 cents($1.00) per fixture <br /> Low voltage fire alarm, low voltage $1.00 per device <br /> heating and air conditioning control wiring <br /> Residing jobs <br /> $50($60.00) <br /> Re-Inspection Fee in addition <br /> to all other fees $50.00($60.00) <br /> Solar fees: <br /> 0kw to 5kw=$90($100) 5.1kw to 10kw=$150($165) <br /> 10.1kw to 20kw=$225($245) 20.1kw to 30kw=$300($330) <br /> 30.1kw to 40kw=$375($410) 40.1kw and larger is$375($410)plus$25 for each additional 10kw <br /> Electronic inspection fee for these items only;furnace, air conditioning, bath fan,fireplace or receptacle for water <br /> heater vent is$40. <br /> Refunds must be requested in writing. No refunds unless more than the minimum fee. Refunds are minus the cities handling fee. <br /> THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED. <br /> Minimum fee permits expire in 6 months. <br /> Dnrmilc n,,nr thn minim,ern foo nnrl i in#n QOC.n/Q 4 nnn\ ovnirn in 4 .ionr <br />
The URL can be used to link to this page
Your browser does not support the video tag.