Laserfiche WebLink
<br />lJA Bonestroo <br />m:::I'If.I Rosene <br />'11\11. Anderlil< IX <br />'1 \I ~ Associates <br />Engineers & Architects <br /> <br />2335 West Highway 36 . St. Paul, MN 55113 <br /> <br />Office: 651-636-4600 . Fax: 651-636-1311 <br /> <br />www.bonestroo.com <br /> <br />September 19,2006 <br /> <br />Honorable Mayor and City Council <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br /> <br />Re: Backage Road and 2) SI Avenue Utility and Street Improvements Project <br />File No. 165-05-143 <br /> <br />Dear Mayor and Council: <br /> <br />The Contractor has asked the City to consider delaying placement of the bituminous pavement <br />and curb & gutter until 2007. The prqject site consists of very wet soils that, once disturbed, can <br />be difficult to recompact. One way to remove the moisture can be to let the area sit through a <br />freeze thaw cycle. This, coupled with a few months of time allows the poorly draining soils to <br />"squeeze out" the overabundance of moisture. Before making this decision here are some pros <br />and cons we shall consider. <br /> <br />Pros for Placing Bituminous and Concrete in 2007 <br />1. Contractor will be able to decrease moistl1re content in the soil, thus achieving higher <br />density in and better stability in the sub-grade. <br />2. Additional year will allow for a full freeze thaw over newly constructed pipe trenches. <br />3. Less capital outlay in 2006. <br /> <br />Cons for Placing Bituminous and Concrete in 2007 <br />I. The Industrial lots will more than likely be less marketable with no in-place road. <br />2. If the City wanted the road opened over the winter a gravel road would have to be <br />maintained. <br />3. In the spring the road would have to be shut down for constlllction until roughly the end <br />of June. <br /> <br />Additional Considerations <br />1. The City is not yet in a position to sell any lots since the platting process has not been <br />completed. <br />2. The County's CSAH 14 phasing plan no longer has the median at 21 sl Ave. being <br />constructed in 2007, but rather scheduled for 2008. <br /> <br />· St. Paul. St. Cloud. Rochester. MN . Milwaukee, WI · Chicago. IL <br /> <br />AUlrmallve Acllon/Equal Opporlunlly Employer and Employee Owned <br /> <br />/F <br />