My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-10-03 Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2006
>
2006-10-03 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2007 3:56:27 PM
Creation date
10/3/2006 4:27:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Centerville Townoffice Park Second Addition <br /> <br />Sedona T ownhomes, LLC, developer and builder of the Centerville <br />Office Park, 7029 20th A venue, proposes to build on Outlot A, the <br />open area on the south end of the office park, a three story office <br />building. The building footprint would be 9,920 square feet, for a <br />total of29,790 square feet, and 149 parking stalls would be <br />available for the building. The open space surrounding the <br />building and parking would be landscaped with maple, ash, spruce <br />trees, flowering crab apple trees, Japanese tree lilacs, and vibumam <br />alfredos. Further, the landscaping in the center island of the <br />parking lot would include tables and benches. On the south end of <br />the new building there would be a large open patio with tables and <br />chairs for outdoor meals and socializing. <br />The exterior of the building would be concrete panels with <br />decorative colors, many windows, and architectural detailing <br />which would accent the entry, comers and rooflines. <br />As part of 20th A venue reconstruction by Anoka County, a new <br />turn lane will be installed at the site entrance. As traffic enters the <br />office park the flow will be into the center of the parking lot and <br />disbursed around and in front of the buildings. It is expected that <br />the people coming to work would arrive during a one-hour time <br />frame in the morning, and leave with a similar disbursal. <br />The building setbacks from lot lines, roadways, neighboring <br />houses and businesses are quite adequate. There is much open <br />space created by Clearwater Creek on the south and west, the <br />office park retainage ponds on the west, the new city commercial <br />park on the east, and City Public Works on the north. Spruce trees <br />on the west will create an effective buffer between the new <br />building and the neighboring houses. <br />Site work and construction would commence once approvals are <br />obtained. The building would be ready for occupancy in the <br />summer of2007. Sedona Townhomes LLC requests your <br />recommendation for approval for this exciting project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.