Laserfiche WebLink
<br />EXHIBIT A <br />60% ENGINEER'S ESTIMATE <br />ANOKA COUNTY <br />C.S.A.H. 14 RECONSTRUCTION <br /> <br />DATE PRINTED: ,0N2006 <br /> <br /> C.SAH. 14 RECONSTRUCTION <br /> UNIT TOTAL PROJECT S.P. 02-614-:U <br /> C.S.A.H.14 C,SAH.54 C.SA.H.21 <br /> S.P.21l).02lH05 S.P. 02-654-001 SP.02-621-009 NOr+PARTICIPATING <br /> ANOKA COUNTY CITY OF LINO LAKES CfTY OF CENTERVlLLE ANOKA COUNTY CITY OF CENTERVILLE ANOKA COUNTY CITY OF CENTERVILLE ANOKA COUNTY CITY OF L1NO LAKES CITY OF CENTERVlLLE <br />ITEM NO. ITEM DESCRIPTION UNIT COST QUANTITIES COST ROADWAY ROADWAY ROADWAY RON>WAY RON:fWAY ROADWAY ROADWAY STORM <br /> QUANTJTES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT OUANTlTIES seGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT OUANTlTlES SEGMENT QUANTITIES SEGMENT OUANTITlES SEGMENT QUANTITIES SEGMENT <br /> ESTIMATE ESTIMATE ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTiMATED COST ESTIMATED COST <br />2506.603 RECONSTRUCT SANITARY MANHOLES UN FT $300,00 72 $21.600.00 60.5 $18.'00.00 6.6 $1.1180.00 .., $1~70.00 <br />2511.501 RANDOM RIP RAP CLASS II CUYD $40.00 340 $13.600.00 340 $13,600.00 <br />2511.501 RANDOM RIP RAP ClASS Ul CUYD $50,00 2925 $146.200.00 2684 $134.200.00 2., $12,050.00 <br />2511.501 RANDOM RIP RAP CLASS N CUYD $60.00 970 $66.200.00 970 $66.200.00 <br />2521.501 4" CONCRETE WALK SOFT $3.25 42626 $'36,634.00 21162 $68,841.60 16503 $63.634.76 2553 $6,291.26 "8 $2.6&8.&0 1570 $&,102.60 <br />2521.501 6" CONCRETE WAlK sa FT $4.00 293 $1.172.00 195 $780.00 56 $224 .00 .2 $'66.00 <br />2521.511 2" BITUMINOUS WAlK sa FT $3.00 181651 $844.983.00 63280 $189,840.00 111621 $334.863.00 6750 $20.200.00 <br />2531.501 CONCRETE CURB & GUTTER DESIGN 6412 lINFT $11.00 330 $3.630.00 125 $1.375.00 125 $1.37&.00 40 ~O.OO 40 $440.00 <br />2531.501 CONCRETE CURB & GUTTER DESIGN 8424 L1NFT $9.00 ,- $143.082.00 8823 $79.407.00 437 $3.933.00 4164 $37 ~76.oo 734 $7.'''.00 486 $4.374.00 710 $6.390.00 .84 $4.361.00 <br />2531.501 CONCRETE CURB & GUTTER DESIGN 8612 UN FT $11.00 1042 $"~2.oo 497 $6~67.00 497 $6~7.oo 24 $264.00 2. $264.00 <br />2531.501 CONCRETE CUR8 & GUTTER DESIGN 8618 UN FT $12.00 306 $3,672,00 153 $1.636.00 153 $' ,636.00 <br />2531.501 CONCRETE CURS & GUTTER DESIGN 8624- LlNFT $9.00 1268<1 $113.220.00 6290 $66.610.00 6290 $66.610.00 <br />2531.501 CONCRETE CURB & GUTTER DESIGN 5512 UN FT $12.00 .04 $6,048.00 252 $3.024.00 252 $3.024.00 <br />2531.507 6" CONCRETE DRIVEWAY PAVEMENT saye $40,00 712 $26,480.00 657 $26,280.00 55 $2.200.00 <br />2531.602 PEDESTRIAN CURB RAMP EACH $500.00 .3 $26,600.00 , 64.000.00 .2 $21.000.00 3 $1,500.00 <br />2351.618 TRUNCATED DOMES SOFT $45.00 4" $20.020.00 92 $4. '40.00 364 $16.360.00 <br />2533.504- CONCRETE MEDIAN BARRIER DESIGN 8337 UNFT $10.00 2046 $20......00 2048 $2O~80.00 <br />2540.602 MAIL BOX SUPPORT EACH $150.00 .9 $6.600.00 59 $6,seo.oo <br />2545.602 INSTAll L1GH! POLE EACH $500,00 , $600.00 1 $600.00 <br />255Hi01 TRAFFIC BARRIER DESIGN BS33S UN FT $20.00 417 $6,340.00 417 $6.340.00 <br />2554,509 GUIDE POST TYPE B EACH $35,00 ,. $626.00 15 $626 .00 <br />2554.521 ANCHORAGE ASSEMBLY - PLATE BEAM EACH $350.00 6 $2,100.00 6 $2.100.00 <br />2554.523 END TREATMENT. ECCENTRIC LOADER BCT EACH $1.700,00 6 $10,200.00 6 $10.200.00 <br />2554.602 IMPACT A TTENUA TOR BARRELS EACH $250.00 60 $'..000.00 36 $9.000.00 24 $6.000.00 <br />2557.501 WIRE FENCE DESIGN 6l).9322 UN FT $12.00 1966 $23,616.00 1968 $23.616.00 <br />2557,501 WIRE FENCE DESIGN 60V-9322 UNFT $12,00 79 $S4S.OO 79 $S4S.00 <br />2563,601 DETOUR SIGNING LUMP SUM $5.000.00 1 $6.000.00 1 $6.000.00 <br />2563.601 TRAFFIC CONTROL STAGE 1 LUMP SUM $50,000,00 , $00.000.00 D':!' $47,&00.00 0.05 $2,500.00 <br />2563.601 TRAFFIC CONTROL STAGE 2 LUMP SUM $20,000.00 1 $20.000.00 OT, $19.000.00 0,05 $1,000.00 <br />2563,601 TRAFFIC CONTROL STAGE 3 LUMP SUM $15,000,00 1 $16.000.00 ,y $14.200.00 0.05 $760.00 <br />2563.601 TRAFFIC CONTROL STAGE 4 LUMP SUM $10.000.00 1 $10.llClO.00 'J9" $6.600.00 005 $000.00 <br />2564.531 SIGN PANELS TYPE C sa FT $25.00 1241 $31,026.00 1061 $26.626.00 69 $1.726.00 111 $2.776.00 <br />2564,531 SIGN PANelS TYPE D SO FT $100,00 ." $51.100.00 511 $61.100.00 <br />2564.1:;02 PAVEMENT MESSAGE (LEFT ARROW) PAINT EACH $125,00 37 $U26.00 30 $3.7.0.00 2 $200.00 5 $62&.00 <br />2564.602 PAVEMENT MESSAGE (L T ARROW) PREFORMED THERMOPlASTIC EACH $325.00 63 $26,17&.00 76 $24.700.00 2 $860.00 5 $1.626.00 <br />2564.602 PAVEMENT MESSAGE (L T - THRU ARROW) PREFORMED THERMOPL EACH $500.00 1 $600.00 1 _.00 <br />2564,602 PAVEMENT MESSAGE (RIGHT ARROW) PAINT EACH $125,00 21 $2.62&.00 17 $2.126.00 2 $260.00 2 $2&0.00 <br />2564.602 PAVEMENT MESSAGE (RT ARROW) PREFORMED THERMOPLASTIC EACH $325.00 37 $12,02&.00 36 $11.37&.00 2 _.00 <br />2564 ,602 PAVEMENT MESSAGE (RT- THRU ARROW) PREFORMED THERMOPL EACH $500.00 2 $1,000.00 2 $1.000.00 <br />2564.602 PAVEMENT MESSAGE (SCHOOL XING) PERFORMED THERMOPLAS EACH $500.00 2 $1,000.00 2 $' .000.00 <br />2564,603 4- BROKEN LINE WHITE. EPOXY L1N FT $0,40 1744 $697.60 1151 $460.40 471 $188.40 122 646.80 <br />2564.603 4" BROKEN LINE YELLOW - EPOXY L1NFT $0.40 1984 $181.60 1954 $781.60 <br />2564.603 4- DOUBLE SOLID LINE YELLOW - EPOXY UN FT $0,90 16302 $14.671.80 13077 $11,769.30 1659 $1,4i3.10 1566 $1,409.40 <br />2564.603 48 DOUBLE SOLID LINE YEllOW - PAINT UNFT $0.50 26937 $13~66.00 22477 $11.236.00 2116 $1.0&8.00 234. $1.172.00 <br />2564.603 4" SOLID LINE WHITE. EPOXY lINFT $0.40 37439 $14,978.60 3464' $13.869.60 1269 s007.60 1521 $60UO <br />2564.603 4" SOLID LINE WHITE - PAINT lIN FT $0,25 269&0 $6.737.00 22484 $6.621.00 2119 $&29.7!I 2347 $&86.7& <br />2564.603 4" SOLID LINE YELLOW. EPOXY LlNFT $0.75 6978 $6,733.00 8978 $6,733.00 <br />2564.603 4- SOLID LINE YELLOW. PAINT LlN FT $0.25 271&6 $6,789.00 22738 $6,684.00 2155 $&38.7& 2263 $666.7!I <br />2564.603 S" BROKEN LINE WHITE - EPOXY lINFT $7.00 166 $1.092.00 156 $1.092.00 <br />2564.603 24" SOLID LINE WHITE. PAINT lINFT $7.00 '63 $1.261.00 80 $680.00 5. $378.00 ., $343.00 <br />2564.603 24" SOLID LINE YELLOW - EPOXY UNFT $5.00 888 $4.440.00 207 $1.036.00 461 $2.30&.00 220 $'.'00.00 <br />2564.603 24" SOLID LINE WHITE - PREFORMED THERMOPlASTIC lINFT $6,00 181 $1.086.00 181 $1.088.00 <br />2564.603 248 SOLID LINE YELLOW. PREFORMED THERMOPlASTIC UN FT $6.00 '296 $7.770.00 1295 $7.770.00 <br />25&t-.61S ZEBRA CROSSWAlK- WHITE PREFORMED THERMOPlASTIC sa FT $10.00 11&2 $11,&20.00 1152 $11,e20.QO <br /> <br />40F a <br />