My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-10-25 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2006
>
2006-10-25 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2006 2:09:34 PM
Creation date
10/20/2006 1:55:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Council 10-11-2006 <br />Summary of Work Session <br /> <br />~~~~ <br /> <br />Present were Mayor Mary Capra, Council members Michelle Lakso, Richard Terway, <br />Tom Lee and JeffPaar. Also present were Administrator Dallas Larson, engineer Mark <br />Statz and City Attorney Kurt Glaser. <br /> <br />The Council discussed the response of Anoka County to the City's proposed changes in <br />the Joint Powers Agreement. It was clear that Anoka County did not concede in any of <br />the areas with significant cost implications. The County was seriously negligent in not <br />including such significant costs as drainage and construction engineering in the MOD <br />which together total almost a half-million dollars. <br /> <br />1. The share of storm sewer calculated by Anoka County did not take into account that <br />the City has installed treatment ponds in conjunction with its developments and <br />there would be very little area adjoining CSAH 14 where this isn't the case. The <br />County hasn't taken that into account. The City engineer will verify the calculations <br />of the County in this regard. <br />2. On the issues of Mobilization and Participation in Traffic Control, the County had <br />previously indicated it would pay for these but now proposed that the City share a <br />portion, though the amount is less than the original draft. The Council agreed that <br />the County should follow its earlier commitment to pay for 100% of these costs. <br />3. The County has proposed to bill the City for considering alternative designs in <br />conjunction with improvements on CSAH 54, but had never suggested that they <br />would charge for considering modifications to their plans. The Council will not pay <br />for this. <br />4. The County has refused to give credit for its savings resulting from alternative pond <br />locations that were suggested by the City. The savings would measure in the <br />hundreds of thousands of dollars. The Council directed thatthe $150,000 credit <br />commitment made by Doug Fisher should be honored, since the City relied on this <br />in determining to go forward with the Backage Road project. <br />5. The Council agreed that the city will not provide power to traffic signals. The <br />County has from the beginning said that traffic signals are entirely a County cost. <br />6. The Council determined that the City could not afford to maintain the County's <br />ponds, but that it would be possible for the City to maintain the main storm sewer <br />lines. <br />7. The Council did not wish to pay for Emergency Vehicle Preemption (EPV) since <br />this relates to a traffic signal that is a County expense. <br />8. The County included a chargeback for construction engineering of8%. The City <br />engineer will verify that the estimate doesn't include items that the City is <br />responsible for inspecting, such as streetscape and utility relocation. <br /> <br />The Council referred the matter to the City attorney to convey the City's position and <br />strong concerns with Anoka County Engineer, Doug Fischer. <br /> <br />Adjourned at approximately 8:25 p.m. <br /> <br />Dallas Larson <br />City Administrator <br /> <br /><g <br />
The URL can be used to link to this page
Your browser does not support the video tag.