Laserfiche WebLink
<br />Centerville Townoffice Park Second Addition <br /> <br />Sedona T ownhomes, LLC, developer and builder of the Centerville <br />Office Park, 7029 20th Avenue, proposes to build on Outlot A, the <br />open area on the south end of the office park, a three story office <br />building. The building footprint would be 9,920 square feet, for a <br />total of 29,790 square feet, and 149 parking stalls would be <br />available for the building. The open space surrounding the <br />building and parking would be landscaped with maple, ash, spruce <br />trees, flowering crab apple trees, Japanese tree lilacs, and viburnam <br />alfredos. Further, the landscaping in the center island of the <br />parking lot would include tables and benches. On the south end of <br />the new building there would be a large open patio with tables and <br />chairs for outdoor meals and socializing. <br />The exterior of the building would be concrete panels with <br />decorative colors, many windows, and architectural detailing <br />which would accent the entry, comers and rooflines. <br />As part of 20th Avenue reconstruction by Anoka County, a new <br />turn lane will be installed at the site entrance. As traffic enters the <br />office park the flow will be into the center of the parking lot and <br />disbursed around and in front of the buildings. It is expected that <br />the people coming to work would arrive during a one-hour time <br />frame in the morning, and leave with a similar disbursal. <br />The building setbacks from lot lines, roadways, neighboring <br />houses and businesses are quite adequate. There is much open <br />space created by Clearwater Creek on the south and west, the <br />office park retainage ponds on the west, the new city commercial <br />park on the east, and City Public Works on the north. Spruce trees <br />on the west will create an effective buffer between the new <br />building and the neighboring houses. <br />Site work and construction would commence once approvals are <br />obtained. The building would be ready for occupancy in the <br />summer of 2007. Sedona Townhomes LLC requests your <br />recommendation for approval for this exciting project. <br />